The Mastic Doctor team standing beside their branded vans outside an office building
Edinburgh · Scotland

Industrial and floor joint sealing in Gilmerton, Edinburgh

Floor joint sealing and filling in warehouses, factories and industrial units across Gilmerton, carried out by CSCS-carded applicators. CHAS accredited and fully insured.

  • Broken arrises where pallet trucks cross
  • Grimy joint lines spoiling a showroom floor
  • Flexible sealant torn out by wheels
1
Send details
Drawings, photos, a joint schedule or a site visit.
2
Get a quote
Scope agreed and priced before anything starts.
3
We seal
Failed joints cut out, faces prepared, new sealant laid.
4
Guaranteed
12-month guarantee on our workmanship.
Covering the South East & Scotland
Constructionline member
£5m PL insurance

Floor joint sealing in Gilmerton

Share the site address and what’s failing, and we’ll reply with a fixed quote or arrange a visit.

Floor joint sealing in Gilmerton, done properly

Open joints take a beating from forklift and pallet-truck wheels. Each crossing knocks the unsupported edge until a crisp saw cut becomes a wide, broken groove. A properly filled joint carries the wheel over and protects both arrises. It also smooths the route for drivers and stock. We work on joints along racking aisles, saw-cut induced joints and forklift and pallet-truck routes, and the failures we’re asked to look at most are brittle joint filler breaking up and grimy joint lines spoiling a showroom floor. One point of contact handles commercial sealant work in Gilmerton from the first photographs to the final walk-round, whether it’s one building or several.

In Scottish cities, where newer extensions meet older stone buildings, movement joints take the difference. Those joints need a sealant with the right movement capability, sized to the gap.

Every job is signed off with a 12-month guarantee. The promise is simple: if the work we did fails within twelve months, we return to fix it.

Where
Gilmerton (EH17, EH16)
Region
Edinburgh
Cover
A 12-month guarantee
Price
Fixed quote, scope in writing
Call
01277 525 020
Updated
3 November 2026
Mastic Doctor team members lined up next to their branded vans outside an office building

Surface by surface

Forklift and pallet-truck routes

Open route joints are hard on equipment and drivers. A filled joint lets wheels roll across and protects the floor.

Semi-rigid joint fillers

If a joint is still opening, a semi-rigid filler may part from one face. That is normally dealt with by topping up later, and we will explain it when we quote.

For managing agents and facilities managers

Main contractors use us as their sealant subcontractor. Programme, specification and site rules come first, with CSCS-carded applicators on site.

Housing associations and managing agents often need work done across blocks and communal areas. We phase the work so people keep access, and each stage is agreed with your contact.

Looking after the joints

Cleaning and maintenance staff play a part too. Share these points with them:

  • Start with the dock areas, where joints fail soonest
  • Hold traffic back until the product has cured
  • Expect fillers on young slabs to need a top-up
  • Sweep debris out of open joints until they can be filled

Normal floor cleaning is fine once the product has cured. Tell us about aggressive cleaning products or hot washing at quote stage so we choose something that tolerates them.

A broken joint on a main route is crossed by every truck on that route. Early treatment protects wheels, loads and drivers as much as the floor.

Your questions answered

Does your area include sites such as Eldin Industrial Estate, near Gilmerton?

Yes. We cover Gilmerton and the area around it, including industrial estates, business parks and retail parks such as Eldin Industrial Estate. To start, just phone 01277 525 020 or email drawings and photos with the unit, the joints involved and your access times.

Must our site in Gilmerton stop work while the joints are done?

Rarely. Work is phased around your operations. Tell us which hours and entrances we can use and we’ll plan from there.

Can you fill joints where the arrises have spalled?

Edge condition is recorded when we look at the floor. Where they have broken away, we’ll tell you before quoting the filling so the filling isn’t wasted.

What do you need from us to quote?

Use our quote form, or email photographs and a plan, with the traffic on each area. A fixed quote follows with the product and phasing set out.

Will we need to close the floor?

In most cases, just the area being treated is coned off. Each zone reopens when the product can take traffic and the next zone follows.

What site paperwork can you supply?

Each site asks for different documents, so tell us what you need and we’ll confirm it when we quote.

Do you seal on top of existing sealant?

No. Overlaying old sealant is a frequent cause of early failure, so everything comes out first.

Common problems we fix in Gilmerton

Soft sealant in a heavily trafficked joint gives the edges little support, so the concrete still breaks beside it. The opposite mistake happens as well: a stiff filler in a joint that keeps moving splits or comes away from the sides.

It’s worth sending us details if you spot any of the following:

  • Loading bay joints breaking down
  • Trucks and loads jolting over damaged joints
  • Flexible sealant torn out by wheels
  • Brittle joint filler breaking up

For estates staff at a university like University of Edinburgh Bioquarter, 1 mile north of Gilmerton, building and paving joints are part of the planned maintenance list.

What your quote should include

  • Will RAMS and insurance details be available?
  • Whether primer will be used where the manufacturer specifies it
  • How the existing material will be dealt with
  • Is the sealant right for the movement and the substrate?

Our contractor checklist

Our process

Before any cutting starts, the area is protected: tape along each joint edge and covers over finishes, stock and equipment close by. The work itself usually takes a day or more, depending on the metres of joint and how many zones the floor is split into, and our waste is bagged and taken away as we go. University, hospital and office estates in Scotland’s cities have their own permits, inductions and sign-in rules. Tell us the rules and we will work to them.

  1. First, the zones and order of work are agreed with you.
  2. Any joints with broken edges are flagged before work starts.
  3. Failed material and debris are removed and the joint cleaned.
  4. We fill the joints with the agreed product, finished level.
  5. You get a time for each zone to reopen.

Preparing the site

  • Have the specification and drawings to hand
  • Let building users know which areas are affected
  • Send asbestos survey details if the building is pre-2000

Ask for a quote

Let us know the site, the scope and your timescale, and a fixed quote will follow. The easiest way is to ring 01277 525 020 or email a schedule or drawings.

Get a price

Advice

What affects the price in Gilmerton

We price every job individually. The main factors are:

  • Travel to remote or island sites
  • Which sealant the job calls for
  • Removal of failed or old sealant
  • Whether the work must be split into stages

Cost follows what’s involved: stripping out, preparation, sealing, access and phasing. Call for a fixed quote.

Details that help us quote

It doesn’t need to be a full survey. A few details are enough to get going:

  • Anything awkward about access or site hours
  • The type of building and who uses it
  • Your programme or deadline
  • Any specification or named product

Every quote starts with the facts: the joints involved, quantities, access and the product called for. Share whatever details you have and we will fill any gaps with a visit.

Where floor joints take the most wear near Gilmerton

Gilmerton is in the east of Scotland, which is drier than the west. Frost and de-icing salt still find their way into open external joints. Resealing before the cold months helps protect the edges. At least three named trading, business or retail sites lie within about 3 miles of Gilmerton. Their warehouses, yards and car parks are exactly where joints take the most punishment.

Phasing is what makes joint work possible on busy sites such as Edgefield Industrial Estate (1.6 miles south-west of Gilmerton): one bay, aisle or car park row at a time. For an estate such as Ellen's Glen Community Hospital, which lies north-west of Gilmerton, the joints in ramps, decks and long building elevations all need attention over time.

Gilmerton is about 4 miles south-east of Edinburgh, in Edinburgh. If you’re looking for floor joint sealing in Gilmerton, we can help. Gilmerton is one of 174 places in Edinburgh on our list for floor joints.

We cover the EH17 and EH16 postcode districts. Buildings on Drum Avenue, Brosie Road and Hyvot Avenue are within our area for floor joints. Access to Gilmerton is via the A772 among other routes. Sites close to Gilmerton are covered too, including Ferniehill (1 mile north), Fernieside (1 mile north), Moredun (1 mile north), Craigour (1 mile north) and Ellen's Glen (1 mile north-west). Bigger towns within reach include Edinburgh (4 miles north-west), Leith (5 miles north), Bonnington (5 miles north), Greenside (4 miles north-west), Broughton (4 miles north-west) and Bellevue (5 miles north-west).

What’s near Gilmerton

Around Gilmerton, our work takes us to commercial buildings near Drum Park and the streets around them. Gilmerton’s nearest station is Shawfair station, roughly 1.8 miles north-east. Nearby you’ll also find Cameron Toll Shopping Centre (2 miles north-west) and Craigmillar Castle (1.5 miles north). For a walk, there’s The New Leaf Co-op and Duddingston Loch.

Map of Gilmerton © OpenStreetMap contributors
Accreditations

Trusted. Accredited. Insured.