
Facade and window perimeter sealing in Melby, Shetland Islands
We carry out facade joint and window perimeter sealing on commercial buildings in Melby. Send photos or drawings for a fixed quote.
- Unsightly perimeter sealant on a visible elevation
- Perimeter sealant that has split or peeled away
- Gaps between rainscreen or cladding panels
Facade sealing for businesses in Melby
Share the site address and what’s failing, and we’ll reply with a fixed quote or arrange a visit.
How we handle facade sealing in Melby
Facade joints are the line of defence between the weather and the building fabric. When a perimeter bead splits or peels, water finds its way behind frames and into the structure. We remove failed sealant and install a new bead chosen for the joint and how far it moves. If you have hard, chalky sealant that no longer flexes and leaks at window and door perimeters, we can put it right, whatever the surface. One point of contact handles commercial sealant work in Melby from the first photos to the final walk-round, for single jobs and planned programmes alike.
For a site around Melby, we plan the mastic in as few trips as the programme allows. Clear drawings, a programme and photos let us bring the right sealants, primers and backing rod first time.
A 12-month guarantee applies to all our work in the Shetland Islands. If an installation problem shows up, phone 01277 525 020 or use the quote form and we’ll arrange a return visit.

- Where
- Melby (ZE2)
- Wider area
- Shetland Islands
- Cover
- 12 months on every job
- Quote
- Fixed quote, scope in writing
- Phone
- 01277 525 020
- Last updated
- 3 November 2026
Surface by surface
Brick and stone facades
Stone can absorb plasticisers from the wrong sealant. The specified stone-compatible sealant is what we use, and mask the edges carefully.
Cladding panel joints
Joints between cladding panels open and close with temperature. The sealant has to match the movement and the panel finish, as the specification sets out.
Why deal with it now?
Resealing a few window perimeters is a small job; repairing water-damaged interiors and fixings is not. Water through a failed joint rarely stays where it starts. Around smaller places like Melby, halls, stores and seasonal buildings may not be checked often, so a failed joint has time to cause damage. Resealing early avoids that.
The product called for affects the cost, as does the preparation each joint needs. Access, phasing and site rules also count.
Why clients in Melby choose us
- One phone line for London, the South East and Scotland
- Work carried out by CSCS-carded applicators
- Constructionline member
- Old sealant cut out, never sealed over
Read how commercial sealant jobs are priced or how we’re accredited.
More services for Melby
What we are called out for in Melby
Sometimes the substrate is the problem: if the edge of the render, concrete or coating breaks away, the bead goes with it. When the joint edges need repair first, we say so.
Common reasons buildings call us in:
- Failed sealant on precast panel joints
- Staining on stone next to old sealant
- Facade joints cracked through the middle
- Weathered facade joints that have lost their grip
Window perimeters and facade joints around Melby need correct width, depth and backing rod as much as a neat finish.
What your quote should include
- The terms of the workmanship guarantee
- How the joint faces will be prepared and primed
- Can the work be phased to keep areas open?
- Will RAMS and insurance details be available?
How the quote is worked out
Your fixed quote is built from the real scope. It allows for:
- Removal of failed or old sealant
- Induction, permit and paperwork requirements
- Access and working height
- Working within restricted access windows
Access often affects the price as much as the sealing: joints within easy reach take less time than ones that need access equipment. Mention the access as part of your enquiry.
What to include in your enquiry
For an accurate fixed quote, we need to understand the site. Useful things to include:
- Where the site is, with the postcode
- How the joints are reached, and at what height
- Rough lengths or quantities, or drawings if you have them
- When you need the work done
Every quote starts with the facts: what’s there, how much of it, how we reach it and what’s specified. Share whatever details you have and we will fill any gaps with a visit.
On site: what to expect
Inspect, seal, sign off: that’s the shape of every visit. First comes an inspection and agreement on scope, then we prepare and seal each joint with the specified product, and the job ends with a walk round and sign-off. Jobs near Melby are often grouped with others in the same area. Let us know if your dates have any give.
- We plan access and the order of elevations with the client.
- We only seal when joints are dry and within the product’s temperature range.
- We remove the old bead and check the edges are sound.
- Joints are cleaned, primed if required and fitted with backing rod.
- Facade-grade sealant goes in and is tooled to a tidy concave profile.
- Once signed off, the work carries our 12-month guarantee.
What we need from you
- Clear stock, furniture or equipment away from the joints
- Confirm the product named in the specification
- Tell us what induction or permit system the site runs
Getting a fixed quote
Send details, get a quote, we seal, guaranteed: that’s how every job runs. To take the first step, call the office on 01277 525 020 or use the quote form.
Read more
Aftercare for building managers
For the best life from the joints:
- Don’t wait for a second leak before calling
- Add perimeter sealant to planned maintenance checks
- Confirm the survey covers external sealants in older buildings
- Insist on a full cut-out when joints are renewed
Record the sealant type and date on the building file. It helps when matching repairs or planning the next reseal without guesswork.
Check older buildings for asbestos before disturbing old mastic. Some older mastics contain it, and work stops until it’s tested if it’s suspected.
Facade sealing around Melby: what changes locally
Melby sits close to the coast, within about 1 mile. Schemes this close to the sea see their facade joints tested by wind and rain from the day they’re sealed, so joint design, primers and product choice deserve extra care. Melby is in the east of Scotland, which is drier than the west. Frost and condensation on frames and panels can still hold up external mastic on winter mornings. External dates keep a little give.
On any site in or around Melby, the mastic follows the specification and the programme.
Melby is in the Shetland Islands. Melby sits inside our coverage and the rest of the Shetland Islands, and jobs here get the same fixed quote and 12-month guarantee as anywhere else. Melby is one of 63 places in the Shetland Islands on our list.
Work on facade joints is covered throughout ZE2, whatever the building. Nearby places we also cover include Sandness (1 mile south-east), Walls (6 miles south-east), Aith (10 miles east), Easter Skeld (11 miles south-east) and Brae (12 miles north-east) for facade joints. For island and remote sites, we plan travel and materials carefully, so the full address helps from the start.
Around Melby
Green spaces nearby include Loch of Norby.
Melby: questions and answers
Can you keep pace with our programme in Melby?
Yes. Send the programme and drawings, and we’ll plan the mastic to suit the stages. Tell us which site documents you need, such as RAMS, our insurance certificate or CSCS details, and they’re confirmed with the quote.
Our building in Melby is near the coast: does that change the sealant?
It can, yes: buildings near the sea take more wind-driven rain, and salt in the air nearer the shore. Product choice and preparation matter more, and sea-facing elevations are worth inspecting more often.
Are you fully insured?
Yes. Our insurance certificate can be sent alongside the quote.
Can one quote cover more than one building?
Yes. We take on portfolio and planned maintenance work, planned site by site to suit how each building is used.
Do you run new sealant over the existing bead?
No. Overlaying is a shortcut that peels away quickly. We remove the failed sealant, clean the faces, set the depth and reseal.
Can you look at water coming in around a frame?
Yes. Photos help, and you can call the office on 01277 525 020 or email drawings and photos to arrange a visit. Failed perimeter sealant is a common cause, but not the only one, and we’ll tell you which.
Is colour matching possible?
Often, yes. Many products come in a range of standard colours, and matching to RAL references or surrounding finishes is often possible. We’ll confirm the colours available for the specified product.