
Rubislaw floor joint sealing
Floor joint sealing and filling in warehouses, factories and industrial units in Rubislaw. CHAS accredited, Constructionline member, with a 12-month guarantee on workmanship.
- Dock area joints that have failed first
- Old filler gone hard, cracked or loose
- Untidy open joints in a retail unit
Floor joint sealing across Rubislaw
Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.
When to call us in Rubislaw
Floor joints collect dust, oil, curing compound and cleaning residue. Without cutting back to sound, clean concrete, the new material simply lifts out.
It’s worth sending us details if you spot any of the following:
- Failing joints at loading bays and dock doors
- A rough ride across broken joints
- Chipped and spalling edges along forklift routes
- Untidy open joints in a retail unit
At places like Mastrick Industrial Estate, which lies north-west of Rubislaw, joints are sealed a section at a time so operations carry on.
Comparing quotes
- How joint depth will be controlled
- Can the work be phased to keep areas open?
- Whether primer will be used where the manufacturer specifies it
- How long is the guarantee, and what does it include?
Floor joint sealing in Rubislaw, done properly
Floor joint sealing for us covers warehouse aisles, loading bays, production halls, retail floors and showroom slabs. Pricing depends on the length of joint, how worn the edges are and when we can get in and the figure is fixed before work begins. We work on saw-cut induced joints, retail and showroom floors and loading bays, and what we’re called in for most is filler that has parted from one face and open saw cuts full of debris. A specialist sealant contractor works differently from a general builder: on jobs in Rubislaw, preparation and product choice get the time they need.
Industrial estates around Scotland’s cities hold warehouses, trade units and distribution sheds, each with saw-cut and construction joints under forklifts and pallet trucks. We work in phases with a product suited to the traffic, so operations carry on.
Building owners and contractors get the same cover: twelve months on the work we carried out. It doesn’t extend to damage, faults in the building or work by others, and we are upfront about that.
- Place
- Rubislaw (AB15, AB10, AB16)
- Region
- Aberdeen
- Cover
- 12 months on every job
- Price
- Fixed quote, scope in writing
- Telephone
- 01277 525 020
- Page updated
- 3 November 2026

Your questions answered
Does the sea air around Rubislaw change the choice of sealant?
It can. Coastal exposure works external joints harder than inland weather. We choose the product for the exposure, prime where the manufacturer requires it and size the joint for its movement.
Will you take on work at estates like Whitemyres Business Centre, close to Rubislaw?
Yes. Our area takes in Rubislaw and its surroundings, with estates and business parks such as Whitemyres Business Centre included. Photos and a short description are enough for a first look.
Does weather matter for sealant work?
For external joints, yes. Sealant needs a dry joint and a temperature within the product’s range, so frost, rain or cold mornings can delay outside work. Internal work is rarely affected.
Can you follow the specification on our project?
Yes. Include it with the drawings when you ask for a quote, and we will price the work to it.
Is it fine to apply new sealant on top of old?
No. We cut the old material out and clean the joint back before sealing, because fresh silicone will not bond with aged silicone.
What information helps you price floor joint sealing?
Approximate metres of joint, photographs of typical and worst areas, and a floor plan let us give a quick quote. We can visit where that helps, and you can phone 01277 525 020 or send details through our quote form to arrange it.
Can you phase floor joint work around operations?
In most cases, just the area being treated is coned off. Each zone reopens when the product can take traffic, then we move to the next.
Diagnose, treat, sign off
Occupied buildings need a little choreography. We sign and contain the area we’re in, with routes through the building left open and work section by section so the rest of the building stays in use. Give us the access times and building rules for your premises in Rubislaw, so the work can be phased and areas kept in use.
- First comes a walk of the floor to record joint sizes, broken edges and traffic routes.
- You get a fixed quote with the product and the phasing set out.
- We remove failed material and packed debris until sound concrete is exposed on both faces.
- Dust is sucked out of the joint and a primer used if the product data sheet asks for one.
- The chosen product is placed to its specified depth and trimmed level with the floor.
- We tell you when each zone can carry trucks again and move on to the next.
Preparing the site
- Explain the parking and delivery arrangements
- Let building users know which areas are affected
- Have the specification and drawings to hand
Ask for a quote
Specifications, drawings and tender packages are welcome with any enquiry, and we’ll price against exactly what is specified. For smaller jobs, photographs and a description will do.
Read more
Floor joint sealing in Rubislaw: the local picture
Rubislaw lies within about 3 miles of the sea. Near the sea, external slabs, ramps and decks see salt air and driven rain as well as their usual loads, so it pays to keep them sealed. Rubislaw is in the east of Scotland, which is drier than the west. Cold winters and gritting are hard on any yard or deck joint left open. Sealing them before winter limits the damage.
Hospital campuses such as Albyn Hospital, 0.8 miles to the east of Rubislaw, grow in stages, leaving movement joints wherever new blocks meet old. A campus such as University of Aberdeen - Foresterhill Campus, 0.8 miles north of Rubislaw, has long runs of movement joint in its buildings, decks and paving.
Rubislaw is about 1 mile south-west of Aberdeen, in Aberdeen. Any commercial site in Rubislaw is covered, whether it’s a single job or part of a planned programme. Our Aberdeen coverage takes in 40 places, large and small.
Business premises anywhere in AB15, AB10 and AB16 are within our area. Among the streets we cover are Forest Road, Harlaw Road and Bayview Road, and sites on any of them can send details for a fixed quote. Rubislaw sits on or close to the A9119, useful when we plan access and materials. Nearby places we also cover include Midstocket (1 mile north), West End (1 mile south), Queen's Cross (1 mile east), Summerhill (1 mile north-west) and Craigiebuckler (1 mile south-west) for floor joints. Nearby towns on our patch include Dyce (5 miles north-west), Cove Bay (3 miles south-east), Bucksburn (3 miles north-west), Peterculter (6 miles south-west), Kingswells (3 miles west) and Milltimber (4 miles south-west).
Around Rubislaw
In Rubislaw, that means premises near Rubislaw and Queens Terrace Gardens, Airyhall Primary School and North East of Scotland Music School. The nearest railway station is Aberdeen station, about 1.6 miles east of the centre. Nearby you will also find Trinity Centre (1.5 miles east) and Gordon Highlanders Museum (0.5 miles south-west). For a walk, there’s Rubislaw Quarry and Gallows Hill.
Why act early in Rubislaw
Broken joints shake trucks, stock and operators alike. That means extra wear on wheels and a rougher ride for staff, adding costs nobody plans for. A filled joint takes most of that out. In a tenement or shared city building, water from a failed joint can reach other owners’ property, which makes early repair simpler for everyone. Fixing it promptly keeps repairs small.
There’s no price list, because the scope varies so much from one building to the next. Call for a quote.
Why choose Mastic Doctor in Rubislaw
- Fully insured
- Products installed to the manufacturer’s instructions
- Sealing commercial buildings since 2005
- 12 months’ guarantee on every job
When it isn’t the sealant
Some faults sit outside our scope, and we point that out rather than sealing over them:
- A floor that is out of level for the racking or trucks
- Wide or random cracking that suggests a structural issue
- Spalled arrises, which need an edge repair first
If you’re not sure, just phone 01277 525 020 or email us and we’ll give you a straight answer before you book.
Joints and surfaces we work on
- Loading bays
- Saw-cut induced joints
- Construction joints
- Retail and showroom floors
- Forklift and pallet-truck routes
- Joints along racking aisles
Places near Rubislaw
What else we do in Rubislaw
Aftercare for building managers
Problems stay small when the joints are checked regularly. Specifically:
- Keep grit out of unfilled joints in the meantime
- Treat loading bay joints first if they’re failing
- Ask drivers not to drag forks or pallets
- Expect fillers on young slabs to need a top-up
If a joint we filled starts to break up within 12 months, tell us and we will arrange a look. After that, a check before your busiest period keeps small repairs small.
A broken joint on a main route is crossed by every truck on that route. Early treatment protects wheels, loads and drivers as much as the floor.
When to bring in a specialist
Using site staff can make sense for a small touch-up, but anything bigger is another matter: a specialist brings efficiency, a consistent finish and a 12-month guarantee.
For most general trades, sealant is a sideline. A specialist brings correct preparation, depth control with backing rod and a product suited to that particular joint, which is what makes a joint last.