
Industrial and floor joint sealing in Old Woking, Surrey
Floor joint sealing and filling in warehouses, factories and industrial units in Old Woking. CHAS accredited and fully insured, with a 12-month guarantee.
- A gap opening alongside old joint filler
- Saw-cut joints left open and packed with grit
- Joint edges breaking up under truck wheels
Floor joint sealing across Old Woking
Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.
When something else is needed
A few problems need another trade or a different fix, and we say so rather than covering them up:
- Spalled arrises, which need an edge repair first
- Structural cracking in the slab
- A floor that rocks at the joints, which needs a structural fix
If you are not sure, just ring 01277 525 020 or use the quote form and we will give you a straight answer.
What we seal
- Loading bays
- Forklift and pallet-truck routes
- Retail and showroom floors
- Construction joints
- Saw-cut induced joints
- Joints along racking aisles
Floor joint sealing in Old Woking
Across Old Woking and the rest of Surrey, it runs the same way: send details, get a fixed quote, we seal, and the work is guaranteed. Approximate joint lengths, a few photographs and a floor plan are enough for a quick quote and a visit can be arranged where that is easier. If you have loading bay joints breaking down and a gap opening alongside old joint filler, we can put it right, whatever the surface. Facilities teams, main contractors and managing agents in Old Woking tend to want the same three things: a fixed quote, no surprises on site and a 12-month guarantee behind the result.
Smaller community and commercial buildings around Old Woking have their own movement joints in walls and floors. They’re easily forgotten until water gets in or an edge breaks.
A 12-month guarantee applies to all our work in Surrey. Should something we installed fail, speak to us on 01277 525 020 or email us and we will come back to it.

- Where
- Old Woking (GU22, GU23)
- Region
- Surrey
- Cover
- 12 months on every job
- Quotes
- Fixed quote, scope in writing
- Telephone
- 01277 525 020
- Page updated
- 3 November 2026
Slabs, ramps and loading bays in Old Woking
The South East is one of the drier parts of the UK. Even so, yard and car park joints are only sealed when they’re dry and clean, and winter de-icing salt on car parks and ramps works into any open joint. Old Woking is about 23 miles from central London. Distribution warehouses and industrial estates are common around the motorway corridors that serve the capital, and their floor joints take forklift and pallet-truck traffic all day.
A healthcare site such as Woking Community Hospital, 1.2 miles to the north-west of Old Woking, depends on car parks, ramps and service yards whose joints take traffic all day. Places like Lion Retail Park, 1.5 miles north of Old Woking, put trolleys over floor joints inside and cars over slab joints outside.
Old Woking is about 2 miles south-east of Woking, in Surrey. We send applicators to Old Woking for floor joints, handled exactly as we handle every other area. 379 places across Surrey fall within our area, Old Woking among them. We also cover Reading, some 21 miles away.
Business premises anywhere in GU22 and GU23 are within our area. Buildings on Ford Road, Farm Road and High Street are within our area for floor joints. If your building is just outside Old Woking, we cover Westfield (1 mile west), Pyrford Village (2 miles north-east), Woking (2 miles north-west), Pyrford (2 miles north-east) and Horsell (2 miles north-west). Further afield, our area takes in Guildford (4 miles south), Camberley (9 miles west), Epsom (12 miles east), Farnham (13 miles south-west), Ewell (13 miles east) and Egham (9 miles north).
Near you in Old Woking
In Old Woking, that means premises near St John the Baptist School, St John the Baptist Catholic Comprehensive School and The New Inn, among other places. Old Woking’s nearest station is Woking station, about 1.4 miles north-west. Nearby you will also find The Peacocks (1.5 miles north-west) and Woking Community Hospital (1.2 miles north-west). The countryside around Old Woking includes Pewley Hill and Boldermere Lake.
Also near Old Woking
Also in Old Woking
Should maintenance staff do it?
For most general trades, sealant is a sideline. A specialist prepares properly, controls joint depth and picks a product with the right movement class, which is what makes a joint last.
There’s also the paperwork. Main contractors and clients often ask for CSCS cards, RAMS and insurance details, and we will confirm the paperwork you need with the quote.
On site: what to expect
When we get to site, we sign in, go through any site induction and check how permits are handled. Everything around the joints gets protected before anything is cut or cleaned, and the work typically takes anything from a day for one loading bay to several days for a large floor, split into phases. For work around Old Woking, we aim to finish in one visit, so photos and measurements up front really help. Then the right materials arrive with us.
- We agree the traffic routes and phasing with your site team.
- Any joints with broken edges are flagged before work starts.
- We clear each run back to clean concrete.
- We fill the joints with the agreed product, finished level.
- You get a time for each zone to reopen.
What we need from you
- Tell staff and tenants when we will be in
- Tell us which areas need to stay in use
- Let us know about inductions and permits
Get a fixed quote
Send us photos, drawings or a joint schedule and a fixed quote comes back to you. Where a site visit makes more sense, we’ll arrange one.
Read more
Common problems we fix in Old Woking
A slab keeps shrinking for a long time after it is cast, and the saw cuts are there so it cracks in straight, controlled lines. As the panels contract, the joints widen, and a filler placed early can part company with one face.
It’s worth sending us details if you spot any of the following:
- Loading bay joints breaking down
- Chipped and spalling edges along forklift routes
- A rough ride across broken joints
- Joint fill separating from the concrete
University campuses such as University of Surrey (to the south-west of Old Woking) have car parks, paved walkways and building elevations with movement joints.
Questions to ask before you book
- The named product and why it was chosen
- How joint depth will be controlled
- Their plan for phasing and protecting the area
- Are they CHAS accredited or on Constructionline?
Old Woking: questions and answers
Is Old Woking off your patch?
No. Places such as Old Woking are covered as much as the big towns. Our area covers London and the South East counties. Send photographs and a list of what needs doing, and we’ll plan the job to need as few trips as possible.
Can you work at a site such as Lion Retail Park, by Old Woking?
Yes. Estates, retail parks and business parks around Old Woking, Lion Retail Park among them, are all within reach. A few photos and the unit address let us price the work.
Do your applicators hold CSCS cards?
Yes. Our applicators hold CSCS cards.
Does weather matter for sealant work?
It can, when the joints are outside. Sealant won’t bond properly to a wet or frosty joint, so we watch the forecast and rearrange outside work if we have to. Indoors, the weather is rarely a problem.
Can you fill joints where the arrises have spalled?
Filling against broken edges doesn’t last. We’ll tell you if the joint edges need repairing first and set out how that affects the job.
How long does a typical visit take?
It depends on the scope, but the work typically takes a day or more, depending on the metres of joint and how many zones the floor is split into. For bigger or phased jobs, we’ll set out a timescale with the quote.
Should floor joints be filled or sealed?
It depends on the traffic and the movement. Forklift routes generally call for a semi-rigid filler that holds the arrises, while joints that move more take a flexible sealant.
Commercial clients in Old Woking
Blocks and communal areas make up much of the work for housing associations and agents. We phase the work so people keep access, and each stage is agreed with your contact.
Building owners and managing agents use us on everything from one building to a spread of sites around Old Woking. Several sites can go on one quote, so there’s one set of paperwork to deal with.
What the job involves on each surface
Construction joints
Construction joints, sometimes called day joints, mark where one pour ended and the next began. They often see more movement than sawn joints and that shapes the choice of filler or sealant.
Forklift and pallet-truck routes
Joints on busy routes need a fill that sits flush and resists impact. We match the product to the wheel types and the traffic.