
Industrial and floor joint sealing in Hoy, Orkney Islands
Floor joint sealing and filling in warehouses, factories and industrial units across Hoy, by CSCS-carded applicators. CHAS accredited and fully insured.
- Open saw cuts full of debris
- Trucks and loads jolting over damaged joints
- Flexible sealant torn out by wheels
Floor joint sealing near Hoy
Photos, a specification or a quick description of the joints is enough to start a fixed quote.
About our floor joint sealing in Hoy
Open joints take a beating from forklift and pallet-truck wheels. Each crossing knocks the unsupported edge, and over time a neat cut turns into a ragged channel. Filling the joint properly gives the edges back their support, which is kinder to trucks, loads and operators. Site teams most often ask us about joint fill separating from the concrete and brittle joint filler breaking up, across retail and showroom floors, joints along racking aisles and forklift and pallet-truck routes. Sealant contractors, mastic applicators, sealant specialists: whatever the job title on the order, in Hoy it comes down to the same thing: failed joints cut out, faces prepared and the right sealant laid to the right depth.
Around smaller Scottish places like Hoy, slabs needing attention are often in agricultural buildings, workshops, schools and hotels. Concrete slabs and yards there take vehicles and weather.
Our 12-month guarantee is about workmanship, not wear and tear. How long a sealant joint lasts depends on movement, exposure, cleaning and use, so we are clear about what is covered before work starts.

- Location
- Hoy (KW16)
- Wider area
- Orkney Islands
- Cover
- A 12-month guarantee
- Quotes
- A fixed quote before we start
- Phone
- 01277 525 020
- Last updated
- 3 November 2026
Quoting for work in Hoy
There’s no standard rate for sealant work, because every site is different. What we take into account:
- The site’s rules and procedures
- How much there is to seal
- Which sealant the job calls for
- How accessible the joints are
There’s no price list, because the scope varies so much from one building to the next. Call for a quote.
Details that help us quote
There’s no need for a formal survey. A few details are enough to get going:
- How the joints are reached, and at what height
- Any dates the work must fit around
- Clear photographs of the problem areas
- Whether an asbestos survey exists
Tell us about the building, the joints and when you need the work done, and a fixed quote will follow. The easiest way is to ring 01277 525 020 or email us.
From enquiry to sign-off
Inspect, seal, sign off: every visit follows that pattern. First comes an inspection and agreement on scope, then we prepare and seal each joint with the specified product, and we finish with a walk round so the work can be signed off. Travel to smaller Scottish places like Hoy is planned so the job is finished in one visit where possible, which is why we ask for photos and a full list first. External joints need a dry spell as well.
- First, the zones and order of work are agreed with you.
- Any joints with broken edges are flagged before work starts.
- Failed material and debris are removed and the joint cleaned.
- The chosen filler or sealant goes in flush with the slab.
- Each area is handed back when ready for traffic.
Before we start on site
- Clear stock, furniture or equipment away from the joints
- Share the asbestos register for older buildings
- Arrange parking or a loading space
Getting a fixed quote
Pricing a project or setting a maintenance budget? Send the scope and any drawings, and we will return a fixed quote that you can work with. For a chat about it beforehand, call 01277 525 020 or email the details over.
Related advice
Aftercare for building managers
A few simple habits keep the new joints working:
- Record damaged joints with a photo and a location
- Start with the dock areas, where joints fail soonest
- Remind operators to lift rather than drag
- Hold traffic back until the product has cured
Walk the main truck routes every few months and look along the joint lines. Watch for filler pulling away from an edge, fresh chipping or grit collecting and keep photographs so changes are easy to compare.
Treating joints while the arrises are sound keeps the work simple. Once they have broken away, edge repair comes first, with more downtime and more disruption.
Questions about Hoy
Will you travel to Hoy on the island?
Yes. Islands are part of our area, Hoy included. We plan island jobs around the ferry and the forecast, and bring everything the job needs on the first crossing.
Our building in Hoy is near the coast: does that change the sealant?
It can. Driven rain and salt are tougher on outside sealant than sheltered inland conditions. We check the specified product suits the exposure and pay close attention to preparation.
What about RAMS and site documents?
Let us know which documents the site needs, such as RAMS, an insurance certificate or CSCS details, and we’ll confirm them with the quote.
Which sealant will you use?
Where there’s a specification, we use the product it names. Otherwise, we recommend a product to suit the joint’s movement, the substrate and the conditions, following the manufacturer’s guidance.
Can you work to our specification?
Yes. Include it with the drawings when you ask for a quote, and we’ll price the work to it.
Can the warehouse stay open while you work?
We phase it. We work aisle by aisle or zone by zone so the rest of the floor stays in use around the site hours and access windows you give us.
What do you need from us to quote?
Use our quote form, or email photographs and a plan, with the traffic on each area. We then send a fixed quote that shows the products and zones.
Other services in Hoy
Building owners, agents and FMs in Hoy
If you look after buildings for someone else, clear figures and clear communication matter. We quote a fixed sum, confirm the scope and walk the finished work with you or your representative, plus a 12-month guarantee.
Agents, factors and owners’ representatives all follow the same route: send details, get a fixed quote, we seal, guaranteed. Keys, access and contacts can be agreed in advance.
Traffic, movement and joints around Hoy
With the shore within about 1 mile, Hoy counts as a coastal location. External movement joints in car parks, ramps and yards near the coast take salt and wind-driven rain on top of traffic, so it pays to keep them sealed. Work on Hoy has to fit the ferry timetable and the forecast. Approximate joint lengths and widths let us bring enough material first time.
Campuses like Robert Gordon University Orkney Project, 3.7 miles north of Hoy, mix old and new buildings, with movement joints wherever they meet. In and around Hoy, the right filler or sealant for each joint depends on the traffic and the movement it takes.
Hoy is about 14 miles west of Kirkwall, in the Orkney Islands. We cover Hoy and the rest of the Orkney Islands, and jobs here get the same fixed quote and 12-month guarantee as anywhere else. Hoy is one of 51 places in the Orkney Islands on our list.
Business premises anywhere in KW16 are within our area for floor joints. You will find Hoy on or near the B9049. Nearby places we also cover include Stromness (4 miles north), Cairston (5 miles north), Clestrain (5 miles north-east), Midland (5 miles east) and Clouston (6 miles north-east) for floor joints. Island and remote sites need extra planning, with travel, ferry crossings where needed and weather to allow for, so mention the location when you ring 01277 525 020 or send details through our quote form.
Near you in Hoy
Other landmarks nearby include Stromness Museum (3.3 miles north). The countryside around Hoy includes Round Hill and South Dam.
What the job involves on each surface
Retail and showroom floors
Polished and coated concrete floors in shops and showrooms show every joint. A flush, neat fill in a suitable colour keeps the floor looking right and confirm which colours the product comes in.
Loading bays and dock areas
Loading bays combine the heaviest turning loads with wet tyres and cold air from open doors. Joints here typically fail first, so they are often the place to start.
Should maintenance staff do it?
Putting right a botched joint often costs more than sealing it well at the start, since all of it has to come out and the faces be cleaned back again. For that reason, many FMs and contractors use a sealant specialist from the outset.
Using site staff can make sense for a small touch-up, but larger jobs are different: a specialist works through quantities efficiently, leaves a consistent finish and backs it with a 12-month guarantee.