The Mastic Doctor team standing beside their branded vans outside an office building
Kent · England

Aldington floor joint sealing

Planning work on a floor joint in Aldington? We look at it, seal it with the right product and hand it over with a 12-month guarantee.

  • Saw-cut joints left open and packed with grit
  • Grimy joint lines spoiling a showroom floor
  • Flexible sealant torn out by wheels
1
Send details
Tell us about the site, with photos if you have them.
2
Get a quote
A fixed quote for the work, with the scope in writing.
3
We seal
Prepared joints, the specified product, a tidy finish.
4
Guaranteed
Backed by a 12-month workmanship guarantee.
South East, London & Scotland
CHAS & Constructionline
£5m public liability

Floor joint sealing for Aldington sites

Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.

Signs you need floor joint sealing in Aldington

Concrete slabs shrink as they dry out, and the saw cuts are there so it cracks in straight, controlled lines. As the panels contract, the joints widen, and a filler placed early can part company with one face.

What tends to prompt an enquiry:

  • Untidy open joints in a retail unit
  • Unfilled floor joints collecting dirt and grit
  • A gap opening alongside old joint filler
  • Failing joints at loading bays and dock doors

Large sites such as William Harvey Hospital (to the north of Aldington) have car parks, service roads and long elevations with movement joints in brick and panels.

Questions to ask before you book

  • Is depth set with backing rod, or bond-breaker tape in shallow joints?
  • Proof of insurance
  • Do they follow the manufacturer’s priming guidance?
  • Health and safety accreditation such as CHAS

How to choose a sealant contractor

Floor joint sealing in Aldington

A working floor can rarely be closed for days on end, so we phase the work aisle by aisle or bay by bay. Tell us your site hours and access windows and we will plan around them, with goods still moving in the areas we aren’t in. The enquiries we see most involve soft sealant dragged out of trafficked joints and open saw cuts full of debris, on loading bays, saw-cut induced joints and forklift and pallet-truck routes. Whoever orders the work in Aldington, the brief is normally the same: a fixed quote, no surprises on site and a 12-month guarantee behind the result.

Jobs around smaller places like Aldington are planned so the whole job is done in one visit, with the right materials on hand. Tell us the joint widths if you can, and what drives or walks over them.

Every job is signed off with a 12-month guarantee. The promise is simple: if the work we did fails within twelve months, we return to fix it.

Location
Aldington (TN25)
Region
Kent
Cover
A 12-month guarantee
Quote
Fixed quote, scope in writing
Phone
01277 525 020
Updated
3 November 2026
Mastic Doctor team members lined up next to their branded vans outside an office building

Your questions answered

Do you take on work at healthcare sites like William Harvey Hospital?

Yes, healthcare and care buildings are part of our work. Work is phased so departments keep running, under the site’s own rules.

Does your area include sites such as Evegate Business Park, near Aldington?

Yes. Estates, retail parks and business parks around Aldington, Evegate Business Park among them, are all within reach. Photos and a short description are enough for a first look.

Are you fully insured?

Yes. We are fully insured, including public liability cover.

Is the floor joint work guaranteed?

Every job has our 12-month guarantee. It applies to our workmanship rather than structural movement or accidental damage.

Are you CHAS accredited and on Constructionline?

Yes. We are CHAS accredited and a Constructionline member.

Do you seal on top of existing sealant?

No. We cut the old material out and clean the joint back before sealing, since fresh sealant will not bond reliably to aged material.

When can forklifts run over new joint filler?

The wait is set by the product’s cure time, and cold floors slow it down. We plan the phasing so that waiting time fits your operation.

On site: what to expect

Tell us your site hours and access windows and we will plan around them. On the day, the work area is kept contained and tidy, and we check in with your contact before moving on to each new area. Rural sites near Aldington may need directions, gate codes or a contact on site. Add it to your enquiry and we will build it into the plan.

  1. Each area is assessed for joint width, arris damage and the wheels that cross it.
  2. You get a fixed quote with the product and the phasing set out.
  3. Old filler, debris and contamination are cut or routed out back to clean concrete.
  4. We vacuum each run and prime it if the chosen product requires a primer.
  5. We fill each joint to depth and finish it flush so wheels roll straight across.
  6. We tell you when each zone can carry trucks again and move on to the next.

Preparing the site

  • Tell us what induction or permit system the site runs
  • Tell staff and tenants when we’ll be in
  • Tell us which areas need to stay in use

Request a quote

A good quote starts with a clear picture: what’s there, how much of it, how we reach it and what’s specified. Send what you have, and we’ll arrange a site visit if anything is unclear.

Ask for a quote

Related advice

Joints that move: notes for Aldington

Rainfall across the South East, Aldington included, is lower than in many parts of the UK. Even so, yard and car park joints are only sealed when they’re dry and clean, and where de-icing salt is spread in winter, open joints let it in. Aldington has at least three named business or industrial parks inside a 3-mile radius. That puts plenty of warehouse floors, service yards and car parks close by, all with joints under traffic.

Phasing is what makes joint work possible on busy sites such as Bliby Business Centre (2.1 miles west of Aldington): one bay, aisle or car park row at a time. Schools such as Aldington Primary School have movement joints in their walls and floors that are easy to overlook.

Aldington is about 5 miles south-east of Ashford, in Kent. We cover commercial sites throughout Aldington, whether it’s a single job or part of a planned programme. We work across 931 places in Kent, large and small. We also cover Brighton, around 50 miles from Aldington.

Postcode districts covered here: TN25 for floor joints. For a building on Earlsfield, Walnut Ridge and Badgers Close or nearby, send details and we’ll quote for floor joints. We also cover Clap Hill (1 mile north-west), Stonestreet Green (1 mile north), Bonnington (1 mile south-west), Postling Green (1 mile south-east) and Aldington Frith (1 mile west) for floor joints. Bigger towns within reach include Ashford (5 miles north-west), Canterbury (14 miles north-east), Folkestone (10 miles east), Hythe (6 miles east), Preston (15 miles north) and Hawkinge (10 miles east).

Landmarks near Aldington

Around Aldington, our work takes us to commercial buildings near Walnut Tree Inn and Poulton Wood and the streets around them. The nearest railway station is Ham Street station, about 4.1 miles south-west. Well-known places in the area include Lympne Castle (3.8 miles east) and William Harvey Hospital (3.6 miles north). Not far away are Hatch Park.

Map of Aldington © OpenStreetMap contributors

Doing it in-house

For most general trades, sealant is a sideline. A specialist brings correct preparation, depth control with backing rod and a product suited to that particular joint.

Using site staff can make sense for a small touch-up, but anything bigger is another matter: a specialist works through quantities efficiently, leaves a consistent finish and backs it with a 12-month guarantee.

Keeping the joints sound

Cleaning and maintenance staff play a part too. Share these points with them:

  • Plan for a top-up on newer floors
  • Check joint lines on busy aisles regularly
  • Start with the dock areas, where joints fail soonest
  • Keep grit out of unfilled joints in the meantime

If a joint we filled starts to break up within 12 months, tell us and we will arrange a look. After that, a check before your busiest period keeps small repairs small.

A broken joint on a main route is crossed by every truck on that route. Sorting it early looks after your equipment as well as the slab.

When something else is needed

Not every problem is a sealant problem, and we’re upfront when that’s the case. It won’t fix:

  • A floor that is out of level for the racking or trucks
  • Cracks across panels caused by settlement or overload
  • Damaged or worn floor coatings and screeds

Not sure which it is? You can ring 01277 525 020 or use the quote form and we’ll tell you honestly before you book.

Surfaces we seal

  • Saw-cut induced joints
  • Retail and showroom floors
  • Construction joints
  • Forklift and pallet-truck routes
  • Loading bays
  • Joints along racking aisles

Owners, agents and contractors

For main contractors, we work as the sealant subcontractor, on new build and refurbishment alike. We work to your programme, your specification and your site rules, with CSCS-carded applicators on site.

We take on planned maintenance as well as one-off repairs: working through a building or an estate in stages that fit your budget. Aldington can form part of a wider programme.

Accreditations

Trusted. Accredited. Insured.