
West Ealing facade sealing
Sealant work in West Ealing for main contractors, managing agents and facilities managers: facade joint and window perimeter sealing on commercial buildings, quoted at a fixed price.
- Draughts around frames and panels
- Leaks at window and door perimeters
- Weathered facade joints that have lost their grip
Facade sealing near West Ealing
Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.
What we are called out for in West Ealing
The wrong product causes its share of trouble: an acetoxy cure can mark stone or corrode some metals, and interior products break down outdoors. Neutral-cure, facade-grade products are what most external joints need.
It’s worth sending us details if you spot any of the following:
- Discoloured or dirty facade joints
- Water coming in around window frames
- Failed seals around shopfront and entrance frames
- Cold air coming in at window perimeters
When units on a site such as Chadha Industrial Estate, 0.6 miles south of West Ealing, are refurbished or reclad, the panel joints and window perimeters are part of the mastic package.
Questions to ask before you book
- How joint depth will be controlled
- Is the sealant right for the movement and the substrate?
- How the existing material will be dealt with
- How they handle RAMS and site documents
Facade sealing in West Ealing
A good facade joint depends on design as much as product. Joint width needs to match how far the joint moves and how far the sealant can stretch, and closed-cell rod sets the depth, keeping the bond to two faces with the ratio the sealant maker recommends, often around 2:1. If you’re dealing with sealant pulling away from frames or panels and weathered facade joints that have lost their grip, we can put it right, whatever the surface. For commercial sealant work in West Ealing, you deal with one contact from quote to sign-off, for single jobs and planned programmes alike.
Around West Ealing, as across London, much of the work is refurbishing existing buildings as well as building new ones. Replacement windows, recladding and fit-outs leave perimeter and facade joints to seal, often next to people still using the building, so tidy, well-planned work matters.
We stand by our work: 12 months, guaranteed. It covers how we prepared and applied the sealant.

- Place
- West Ealing (W7, W13, UB2)
- Region
- Greater London
- Guarantee
- 12 months on every job
- Quote
- A fixed quote before we start
- Telephone
- 01277 525 020
- Page updated
- 3 November 2026
Site staff or a sealant specialist?
Using site staff can make sense for a small touch-up, but anything bigger is another matter: a specialist brings efficiency, a consistent finish and a 12-month guarantee.
Site maintenance staff can often handle a short internal joint. The usual problems come from preparation: sealing over old material, sealing onto damp or dusty surfaces, or a product that can’t take the movement.
FAQs: West Ealing
Will you plan work around the academic year at somewhere like University of West London?
Yes, holiday working periods are the norm on campus jobs. Tell us which site documents you need, such as RAMS, our insurance certificate or CSCS details, and they’re confirmed with the quote.
Do you take on jobs in West Ealing where loading and access are tightly controlled?
Yes. Inductions, permits and timed loading are routine for us in London. Share the building’s contractor rules and we’ll work to them. We allow for the ULEZ, which covers every borough
Do you replace failed glazing units?
No. That work needs a glazing specialist. We reseal window perimeters, panel joints and frame-to-structure perimeters on commercial buildings.
Does weather matter for sealant work?
Outside, yes. The joint has to be dry and within the product’s temperature range, so frost, rain or cold mornings can delay outside work. Inside work is seldom held up.
How much does the work cost?
Each job is quoted on its own details. To get one, give us a call on 01277 525 020 or email us.
What site paperwork can you supply?
Each site asks for different documents, so tell us what you need and we’ll confirm it when we quote.
Are you CHAS accredited?
Yes. We’re CHAS accredited, we’re a Constructionline member and we use CSCS-carded applicators.
What we can’t put right
A proper diagnosis includes knowing what sealant can’t do. You will hear from us if the cause turns out to be any of the following:
- Installing or repairing glazing systems
- Joints whose design needs changing by the specifier
- Providing access systems for the work
Not sure which it is? You can speak to us on 01277 525 020 or send photos by email and we’ll tell you honestly.
Joints and surfaces we work on
- Cladding panel joints
- Coping and flashing joints
- Stone and brick facade joints
- Perimeter joints where frames meet the structure
- Shopfront frames
- Window and door perimeters
Our process
Before any cutting starts, the area is protected: masking tape along the joint edges and sheeting over anything nearby. The work itself normally takes anything from a single day to several weeks, depending on joint lengths, access and the weather, and our waste is bagged and taken away as we go. Planning a London job such as one in West Ealing starts with access. Give us the hours we can be on site and we’ll schedule to suit.
- We start with photos, drawings or a visit to see the joints and agree access.
- We confirm the joint type, movement and the specified product.
- The existing bead comes out in full and both faces cleaned back.
- Primer is applied where the maker specifies it.
- Rod goes in to fix the depth, then the joint is sealed and tooled.
- The finished joints are checked with you.
Getting the site ready
- Tell us your opening times and when work is allowed
- Send asbestos survey details if the building is pre-2000
- Move anything stored against the joints
Getting a fixed quote
Specifications, drawings and tender packages are welcome with any enquiry, and we will price the work to it. Smaller jobs need nothing more than photos and a few notes.
Advice
Facade sealing around West Ealing: points for this area
A good number of hotels sit less than 2 miles from West Ealing. Hotel schemes tend to have fixed reopening dates, so the mastic is programmed tightly with the other trades. The ULEZ covers the whole of Greater London, West Ealing included, so site vehicles need to meet its standards or pay the daily charge. Add booked deliveries and tight storage, and the mastic package needs planning with the site team.
Extensions at sites like Ealing Hospital (to the south-west of West Ealing) typically sit beside working departments, and the mastic follows strict access rules. Further education sites such as Ealing and West London College, 1.4 miles east of West Ealing, are extended and refurbished from time to time, with mastic often programmed into the summer break.
West Ealing is about 1 mile west of Ealing, in Greater London. Across the W7 postcode area, the process is the same: send details, get a fixed quote, we seal, and the work is guaranteed. We work across 764 places in Greater London, from busy centres to rural villages. Our London page has more on work in that area.
We cover the W7, W13 and UB2 postcode districts for facade joints. If your site is on Park Road, Green Lane and Dean's Road or close by, send details and we’ll quote for facade joints. Being close to the A4001, West Ealing is straightforward for us to reach. Close to West Ealing, our area also takes in Hanwell (1 mile east), Dormers Wells (1 mile north-west), Ealing (1 mile east), South Ealing (2 miles east) and Pitshanger (2 miles north-east). Bigger towns within reach include London (11 miles east), City of Westminster (8 miles east), Marylebone (8 miles east), Kensington (6 miles east), St Pancras (10 miles east) and Shoreditch (11 miles east).
Landmarks near West Ealing
Recent enquiries here include premises near Drayton Green, The Viaduct pub and Cuckoo Schools. West Ealing has its own railway station: Hanwell station. Well-known places in the area include Gunnersbury Park House - Large Mansion (2.4 miles east) and Treaty Centre (3 miles south). Not far away are Long Wood and Middle Lake.
Looking after the joints
Every sealant joint needs some looking after, and how long they last depends on how they’re treated. We suggest:
- Avoid patch repairs on failed facade joints
- Confirm the survey covers external sealants in older buildings
- Record the product and colour used on each elevation
- Don’t wait for a second leak before calling
Record the sealant type and date on the building file. Future work can then match the product and colour without guesswork.
Don’t wait for a full elevation to fail. Small repairs stop small leaks becoming large ones.
Towns and villages near West Ealing
More services for West Ealing
Owners, agents and contractors
Housing associations and managing agents often need work done across blocks and communal areas. We phase the work so people keep access, and each stage is agreed with your contact.
Hospitality, education, healthcare, office and retail clients come to us directly as well. We plan around the way the building is used, so the building keeps working while we do.