
Longman facade sealing
Commercial sealant work in Longman for contractors, FMs and building owners: facade joint and window perimeter sealing on commercial buildings, quoted at a fixed price.
- Damp patches beside frames after rain
- Weathered joints at frame-to-structure perimeters
- Failed sealant on precast panel joints
Facade sealing for businesses in Longman
Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.
Leave it or put it right?
If access is already up for other work, resealing at the same time makes sense. Coordinating facade sealing with other external works avoids paying for access twice. Exposed buildings in Scotland take a lot of weather, and for a smaller place like Longman, a repair visit takes planning, so it’s better to act early.
Larger quantities, tricky access or phasing all shape the price. So do site requirements such as inductions and permits, along with the time of year for external work.
Why us?
- Matching to RAL references, product permitting
- Work to your specification and the manufacturer’s guidance
- Clear, fixed quotes
- Public liability insurance in place
See what affects the cost or our accreditations and insurance.
Facade sealing for commercial buildings in Longman
We don’t install glazing systems or replace glass. We handle the sealant joints that surround those elements: the frame-to-structure perimeter, panel-to-panel joints and window and door surrounds, using sealants classified for facade or glazing use. If you have staining on stone next to old sealant and water coming in around window frames, we can put it right, whatever the surface. Most enquiries from Longman start with one failed joint and grow into a wider look at the building: we check the joints around it and give you an honest view of what needs doing now and what can wait.
Outside mastic in Scotland needs a dry, frost-clear joint, and in a place like Longman that means watching the forecast. We build some give into the plan and agree it with the site manager.
Building owners and contractors get the same cover: twelve months on the work we carried out. Faults in the structure, damage and other trades’ work fall outside it, and we say so plainly.

- Place
- Longman (IV1, IV3, IV2)
- Wider area
- Highland
- Cover
- 12 months on our workmanship
- Quote
- Fixed quote, scope in writing
- Telephone
- 01277 525 020
- Updated
- 3 November 2026
What sets the cost
There’s no standard rate for sealant work, since sites vary so much. What we take into account:
- Access and working height
- The size and state of each joint
- How much there is to seal
- Induction, permit and paperwork requirements
We don’t publish prices, since every building and every scope is different. Call for a quote.
What we need to price the job
Good information means a firmer quote. When you get in touch, include:
- Any dates the work must fit around
- The type of building and who uses it
- Rough lengths or quantities, or drawings if you have them
- Asbestos survey details if the building is older
For a fixed quote, phone 01277 525 020 or email drawings and photos, telling us the site location and the nature of the job. Our quote form is another easy route.
Aftercare for building managers
Once the work is signed off, these steps help:
- Note when each elevation was last resealed
- Add perimeter sealant to planned maintenance checks
- Check the asbestos register before old mastic is disturbed
- Check that rainwater leaves the facade the way it was designed to
Blocked sills and gutters push water at the joints. Sealant copes better when water runs off the facade as designed.
Tie resealing in with redecoration, cladding repairs or other access. One set-up for several trades saves money.
Doing it in-house
A short, simple internal joint is often within reach of a maintenance team. Where it goes wrong is preparation: sealing over old material, sealing onto damp or dusty surfaces, or a product that can’t take the movement.
General builders and handymen seal joints, but it isn’t their main trade. A specialist prepares properly, controls joint depth and picks a product with the right movement class, which is what makes a joint last.
How a job runs
We bring the products specified for the job, along with primers and backing rod. Joint faces are cleaned back to sound, dry surfaces, the manufacturer’s primer is applied where it’s called for, and each bead is tooled to a neat concave finish. Where we can, we combine work around Longman with other jobs nearby, to make the most of each trip. Tell us how flexible your dates are.
- Access, site rules and timing are settled with the client up front.
- We only seal when joints are dry and within the product’s temperature range.
- Each joint is cut out and the edges inspected.
- Joints are cleaned, primed if required and fitted with backing rod.
- Facade-grade sealant goes in and is tooled to a tidy concave profile.
- Once signed off, the work carries our 12-month guarantee.
Preparing the site
- Clear stock, furniture or equipment away from the joints
- Share the asbestos register for older buildings
- Let building users know which areas are affected
Request a quote
A good quote starts with a clear picture: the joints involved, quantities, access and the product called for. Share whatever details you have and we’ll fill any gaps with a visit.
Advice
Facade sealing in Longman: the local picture
Longman is within about 1 mile of the coast. On a coastal site, facade and perimeter joints face driven rain and, closer to the beach, salt, so joint design, primers and product choice deserve extra care. Plenty of hotels sit less than 2 miles from Longman. Hotel extensions and refits usually have to fit around bookings, so mastic dates are tight.
For a contractor at a hotel such as Chieftan Hotel, which lies south-east of Longman, the mastic often has to be finished before a reopening date. University estates such as University of the Highlands and Islands, 1.2 miles to the south of Longman, tend to have a rolling programme of new buildings and refurbishments, each with window perimeters and facade joints to seal.
Longman is about 1 mile north of Inverness, in Highland. Businesses, contractors and managing agents in Longman can call on us for facade joints. 256 places across Highland fall within our area, Longman among them.
We cover the IV1, IV3 and IV2 postcode districts for facade joints. We cover commercial and managed buildings on Burnett Road, Longman Road and Stadium Road. If your building is just outside Longman, we cover Millburn (1 mile south-east), Crown (1 mile south-east), Merkinch (1 mile west), Inverness (1 mile south) and Ballifeary (2 miles south-west). A short drive away, we cover Nairn (15 miles north-east), Cradlehall (3 miles east), Dingwall (11 miles north-west), Alness (14 miles north), Invergordon (14 miles north) and Muir of Ord (9 miles west). Island and remote sites need extra planning, with travel, ferry crossings where needed and weather to allow for, so give the site location in your enquiry.
Near you in Longman
Locally, jobs take us to sites close to Cavell Gardens and 1 Grant Street pub and the streets around them. The closest station to Longman is Inverness station, roughly 0.6 miles south. Other landmarks nearby include Inverness Castle (0.8 miles south) and Royal Northern Infirmary (1.3 miles south). Open spaces near Longman include Tomnahurich.
What we are called out for in Longman
A frequent fault is a bead stuck to the joint’s rear face as well as its sides. Without rod or bond-breaker tape, the bead is held back.
Any of the following is a good reason to get the joints checked over:
- Previous reseals run over old sealant
- Old perimeter mastic that has dried out
- Leaks at window and door perimeters
- Discoloured or dirty facade joints
Units on estates such as Carse Industrial Estate, 1 mile west of Longman, tend to be reclad and refitted as tenants change, and each job leaves cladding and perimeter joints to seal.
Before you book anyone
- How the joint faces will be prepared and primed
- The terms of the workmanship guarantee
- How joint depth will be controlled
- How the existing material will be dealt with
Also in Longman
Longman: questions and answers
Do you cover business parks and estates near Longman, such as Carse Industrial Estate?
Yes. We cover Longman and the area around it, including industrial estates, business parks and retail parks such as Carse Industrial Estate. A few photos and the unit address let us price the work.
Do you take on work at healthcare sites like Royal Northern Infirmary?
Yes. Healthcare sites are among the places we work. We follow the site’s permits, sign-in and infection-control procedures in every area.
Can you quote from photos?
It depends on the job. Straightforward work can often be priced from photos and measurements, while larger or less clear jobs get a site visit first.
Can you fit around our working hours?
We’re in the office from 8am until 5pm, Monday to Friday. Let us know your site hours and access windows, and the work will be planned around them.
Is it fine to apply new sealant on top of old?
No, never. Overlaying old sealant is a frequent cause of early failure, so everything comes out first.
Can you find out why a window is leaking?
Yes. We look at the perimeter sealant and tell you whether it has failed. If the water seems to come from a roof, sill or the glazing unit instead, we say so.
Are you CHAS accredited and on Constructionline?
Yes. We’re CHAS accredited, we are a Constructionline member and we use CSCS-carded applicators.