
Voe washroom sealing
Sealing in commercial washrooms, showers, kitchens and wet areas in Voe and across the Shetland Islands. CHAS accredited and fully insured, with a 12-month guarantee.
- A new bead over an old one coming away
- Kitchen worktop joints that can’t be kept clean
- Failed joints along IPS and cubicle panels
Washroom sealing in Voe
Share the site address and what’s failing, and we’ll reply with a fixed quote or arrange a visit.
Owners, agents and contractors
Hotels, schools, healthcare sites, offices and retail units book us directly too. The work is planned around how the building runs, so guests, pupils, patients or staff are disturbed as little as possible.
Blocks and communal areas make up much of the work for housing associations and agents. Work can be phased so residents and staff keep access throughout, with each stage agreed with your site contact.
How we handle washroom sealing in Voe
In a busy washroom, the sealant usually gives up long before the tiles or fittings. Basin tops, urinal backs, panel joints and shower trays put it under water, chemicals and daily cleaning and mould that roots into it can’t be cleaned away. The fix is to remove it completely and reseal with sanitary silicone containing anti-mould additives. If you have black mould inside silicone joints that cleaning can’t shift and shower tray joints that have opened up, we can put it right. One point of contact handles commercial sealant work in Voe from the first photographs to the final walk-round, for single jobs and planned programmes alike.
Hotels and holiday accommodation in rural Scotland have busy and quiet seasons, so washroom work is often best planned for quieter months.
Our workmanship is guaranteed for 12 months, in Voe as everywhere else we work. If our installation lets you down in that time, we return and fix it.

- Location
- Voe (ZE2)
- Region
- Shetland Islands
- Cover
- 12 months on our workmanship
- Quote
- Fixed quote, scope in writing
- Call
- 01277 525 020
- Updated
- 3 November 2026
What we’re called out for in Voe
Mop buckets, trolleys and knocks from users damage joints near the floor at skirting lines, urinal bases and around pans.
Clients usually get in touch after noticing one or more of the following:
- Open joints along basins and vanity units
- Stained sealant around pans and urinals
- Complaints from staff, guests or users about tired washrooms
- Sealant lifting along a tray edge
In any commercial washroom in or near Voe, mouldy sealant is cut out rather than cleaned, and anti-mould sanitary silicone goes on clean, dry joints.
Before you book anyone
- Which product they’ll use, and why it suits the joint
- Their approach to joint depth and backing
- Who will actually carry out the work
- How long is the guarantee, and what does it include?
Site staff or a sealant specialist?
Paperwork matters too. Many sites expect CSCS cards, RAMS and proof of insurance, and we will confirm the paperwork you need with the quote.
What you see is the finished bead, but most of the work is hidden. Backing rod, primer where specified and a joint designed to move with the building are where general trades tend to cut corners.
How a job runs
Occupied buildings need a little choreography. The work area is signed and kept contained, with routes through the building left open and move on in phases so staff and visitors can carry on around us. Travel to smaller Scottish places like Voe is planned so the job is finished in one visit where possible, so photos, sizes and a full list matter. Outside work also needs a suitable weather window.
- Every washroom is checked joint by joint, with loose panels, leaks or damp noted for the right trade.
- A phasing plan keeps part of the building’s facilities in use at all times.
- Failed silicone is removed completely and the surfaces cleaned of every trace.
- Joints are cleaned, degreased and dried before sealing.
- New sanitary silicone with anti-mould additives goes in and is tooled neat.
- Rooms reopen after the product’s cure time, and we move to the next.
What we need from you
- Have the specification and drawings to hand
- Explain the parking and delivery arrangements
- Move anything stored against the joints
Getting a fixed quote
Need a figure for a tender or a budget? Send the scope and any drawings, and we’ll return a fixed quote that you can work with. If you have questions first, call 01277 525 020 or use the quote form.
Read more
Questions we are asked in Voe
Must every washroom in our Voe building shut while you work?
Not all at once. We take one block of facilities at a time. We’ll tell you the curing time for the product before we start.
Which documents can you supply for work in Voe?
We will confirm the paperwork you need, such as RAMS, our insurance certificate and CSCS details, with the quote. We are CHAS accredited and a Constructionline member, with £5m public liability insurance and CSCS-carded applicators.
What do you charge?
It depends on the job: the volume of work, the access, the specified product and how it’s phased. Call for a fixed quote and we’ll price it properly.
How do I request a quote?
There are four steps: send details, get a quote, we seal, guaranteed. Step one needs little more than photographs and a postcode.
Which sealant will you use?
If the job is specified, we follow the specification. Otherwise, we recommend a product to suit the joint’s movement, the substrate and the conditions, following the manufacturer’s guidance.
Will your applicators have CSCS cards?
Yes. If you need card details for site access, tell us and we will confirm them with the quote.
When can showers be used after new sealant?
Cure times vary by product and temperature. You will get a reopening time for each area before we leave it.
More services for Voe
Aftercare for building managers
Every sealant joint needs some looking after, and their life depends on movement, exposure, cleaning and use. Our advice:
- Respect the cure time before reopening each room
- Report split joints at trays and basins early
- Keep a record of which washrooms need attention
- Don’t leave trays and floors sitting wet
Add washroom sealant to routine inspections. Check for mould spots, splits, lifting edges and open joints at trays, basins and urinals and photograph anything new.
A split joint at a shower tray can leak for a long time before anyone sees it. By then, other trades may be needed as well so failed joints are worth acting on quickly.
Washroom sealing around Voe: how the place shapes the job
The sea is no more than about 1 mile from Voe, and coastal hotels, guest houses and holiday sites tend to fill up in the busy months. Washrooms used guest after guest wear their sanitary silicone faster, so we plan the work for quieter weeks where possible. Voe is in the east of Scotland, which is drier than the west. Even so, a washroom that doesn’t dry out between uses will see mould get into its sealant.
For a hall at a building such as Voe Kirk, resealing the kitchen and toilets can be fitted between bookings.
Voe is in the Shetland Islands. Voe sits inside our coverage, with the same fixed quotes and 12-month guarantee as everywhere else. Voe is one of 63 places in the Shetland Islands on our list for washrooms and wet areas.
We cover the ZE2 postcode districts. Among the streets we cover are Norderhoull, Isles Road and Mulla, and sites on any of them can send details for a fixed quote. We also cover Brae (4 miles north-west), Dury (4 miles south-east), Vidlin (4 miles east), Scatsta (5 miles north) and Sullom (6 miles north-west). Further afield, our area takes in Lerwick (15 miles south), Sound (15 miles south) and Scalloway (15 miles south). For island and remote sites, we plan travel and materials carefully, so include the location in your enquiry.
Landmarks near Voe
Nearby you will also find The Cabin Museum (3.3 miles east). Open spaces near Voe include Loch of Voe.
Why act early in Voe
Waiting for a holiday closure can leave failing joints in place for a long time. Phasing lets it happen now, with facilities kept in use. Buildings that aren’t in daily use, such as halls and seasonal premises, may let water in unnoticed, so a failed joint has time to cause damage. Resealing early avoids that.
The price depends on how many linear metres there are, how much old material needs removing and the access. Call for a fixed quote once you have the details.
Why choose Mastic Doctor in Voe
- CSCS-carded applicators
- Joints cleaned back to sound surfaces
- 12 months’ guarantee on every job
- Work to your specification and the manufacturer’s guidance
Take a look at how commercial sealant jobs are priced and our accreditations and insurance.