Argyll and Bute · Scotland
Commercial sealant contractors in PA46
We cover every part of the PA46 postcode district, which takes in Bunnahabhain, Keills and Port Askaig. Failed sealant is always cut out completely, with a 12-month guarantee.
Sealant work in PA46
Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.
Places in PA46
What we do in PA46
- Mastic sealing for building owners and managing agents
- Facade and window perimeter sealing
- Commercial washroom and wet-area sealing
- Fire-rated sealing and fire stopping
- Coloured and colour-matched sealant
- Expansion and movement joint sealing
- Construction and new-build mastic
- Commercial sealant contractors
- Industrial and floor joint sealing
- All services
Let us know the job and your postcode for a fixed quote: call 01277 525 020 or email drawings and photos.
Nearby postcode districts
More in Argyll and Bute
All places in Argyll and Bute
Every area we cover
Commercial sealant contractors across PA46: what to expect
Mastic Doctor has been sealing joints for businesses and contractors since 2005: CHAS accredited, Constructionline member, five million pounds of public liability insurance and CSCS-carded applicators. If your site needs RAMS, an insurance certificate or CSCS details, say so and we will confirm with the quote. The enquiries we see most involve movement joints packed with grit and debris and leaks that seem to come through a sealant line, across kitchen worktops and splashbacks, movement joints in walls and floors and washrooms and tea points.
Working in a building that stays open takes some planning. The work area is signed and kept contained, keep walkways clear and work section by section so the rest of the building stays in use.
- First, details reach us through the quote form or a site visit.
- The cause is diagnosed and the scope priced as a fixed quote.
- Where parts of the building must stay open, the work is phased.
- Old sealant is cut out completely, never sealed over.
- Each joint gets a suitable sealant, laid to depth and tooled.
- We check the work with you, and the 12-month guarantee starts.
How we quote
What a job costs comes down to the quantity of joints, what has to come out first and the access. Call for a quote when you’re ready.
Why clients in PA46 choose us
- A Constructionline member, so easy to vet
- CHAS accredited contractor
- Matching to RAL references, product permitting
- Colours confirmed for the specified product
Quotes
To get a fixed quote, ring 01277 525 020 or use the quote form. Our quote form is another easy route.
Around Bunnahabhain
A little further out are Finlaggan Castle (3.8 miles south-west). Open spaces near Bunnahabhain include Giùr-bheinn and Ardnahoe Loch.
Shops, offices and hotels in PA46
Commercial buildings across PA46 range from older premises altered many times to recent units on business parks. Each building needs the right product for its surfaces, from stone and brick to coated aluminium and laminate.
Across PA46, outside sealant work is planned around the weather, with a little give in the programme for wet or frosty days. Coastal places in PA46 often have hotels, guest houses and holiday accommodation with busy seasons, so work is often best planned for quieter months.
Bunnahabhain: Where a joint is on show in Bunnahabhain, we’ll check which shades the product offers before work starts. For any commercial premises in Bunnahabhain, a lasting joint depends on full removal of the old sealant and clean, dry faces.
After the work
Problems stay small when the joints are checked regularly. Specifically:
- Keep a record of which joints were resealed and when
- Look at the sealant around anything that has been moved or replaced
- Keep washroom and kitchen extraction working
- Check the asbestos register before anyone disturbs old sealant in an older building
Keep an eye out for other trades after we’ve gone. Shop refits, new services and replaced fittings often break the seal around them, and it’s easy to forget to reseal afterwards. Where work has disturbed a joint, just call the office on 01277 525 020 or send photos by email for a quote.
Each spell of wet weather pushes more water through an open joint. Behind a panel or frame, that water can sit unseen for a long time. Catching it at the sealant stage avoids the bigger repair.
When it isn’t the sealant
A proper diagnosis includes knowing what sealant can’t do. You will hear from us if the cause turns out to be any of the following:
- Water from a services leak rather than a joint
- Suspect materials that need testing and specialist removal
- Misted, cracked or failed glazing units (a glazier’s job)
Should maintenance staff do it?
Redoing a failed joint typically costs more than getting it right at the outset, because the whole bead must be removed and the faces cleaned back again. That’s why many clients bring in a specialist from the beginning.
Paperwork matters too. Main contractors and clients often ask for CSCS cards, RAMS and insurance details, and we will confirm the paperwork you need with the quote.
Why act early?
Some managers wait for a fit-out before touching the mastic. That’s reasonable for internal joints that are just tired-looking, but a joint letting water in now keeps doing damage until the refurb arrives. Splitting the scope into now and later is often the sensible compromise.
Questions to ask before you book
- How long is the guarantee, and what does it include?
- Their pre-qualification and accreditations
- How joint depth will be controlled
- Will CSCS-carded applicators be on site?
Building owners, agents and FMs in PA46
Main contractors use us as their sealant subcontractor on new-build and refurbishment projects. Programme, specification and site rules come first.
Hotels, schools, healthcare sites, offices and retail units come to us directly as well. We plan around the way the building is used, so guests, pupils, patients or staff are disturbed as little as possible.
PA46: questions and answers
Is it OK to apply fresh sealant over existing beads?
The old bead is stripped out first. After that come cleaning, primer where needed, backing and the new sealant.
What guarantee do you give on resealing?
The work is guaranteed for 12 months. Should anything we did fail within that period, let us know.
Could the old sealant in an older building contain asbestos?
We check the asbestos register or survey before any old sealant is disturbed. Managing asbestos is the dutyholder’s responsibility.
How do you choose the sealant?
Where there’s a specification, we use the product it names. If not, we choose for the movement, the surfaces and the conditions, in line with the manufacturer’s guidance.
Can weather delay the job?
For external joints, yes. The joint has to be dry and within the product’s temperature range, so frost, rain or cold mornings can delay outside work. Inside work is seldom held up.
Do you seal on top of existing sealant?
No, never. Overlaying old sealant is a frequent cause of early failure, so everything comes out first.
Which site documents can you send us?
Tell us what site paperwork you need (RAMS, insurance certificate, CSCS details) and we will confirm with the quote. We hold CHAS accreditation and Constructionline membership and carry five million pounds of public liability insurance.