Greater London · England

Commercial sealant contractors in CR90

Our applicators cover all of the CR90 postcode district, which takes in Broad Green and Old Town. Failed sealant is always cut out completely, with a 12-month guarantee.

Sealant contractors for CR90

Photos, a specification or a quick description of the joints is enough to start a fixed quote.

How commercial sealant contractors works in CR90

Commercial occupiers rarely want a floor out of action for sealant work. Work is scheduled around the site hours and access windows you give us; phased work can also be planned so areas stay in use. That applies whether the building is an office, a shop, a hotel, a college or a care home. We work on floor and threshold joints, kitchen worktops and splashbacks and movement joints in walls and floors, and the usual reasons a site gets in touch are earlier reseals applied straight onto the failed bead and messy, uneven beads from earlier work that let the building down.

Before we leave any area, we remove the tape, clean down and inspect every joint. Where the sealant needs time to cure before use, we tell you and sign the area.

  1. We begin with whatever information you have, whether that’s photographs, a drawing or a list of locations, and a site visit is booked where it helps.
  2. The failure is diagnosed and a fixed quote issued for the work agreed.
  3. Site hours, access windows and the order of areas are agreed before we start.
  4. The failed bead is removed and the joint faces cleaned until they’re sound and dry.
  5. We fit backing to the right depth, prime where specified and lay the new bead.
  6. Each area is inspected, signed off and backed by our 12-month guarantee.

What you’ll pay

No two sites price the same: joint size, product, access and site hours all play a part. Send the details and a fixed figure follows.

What you get with us

  • Colour options checked against the specified product
  • Failed material removed, not covered up
  • Commercial sealant work since 2005
  • Products installed to the manufacturer’s instructions

Ask for a quote

Photos, drawings or a schedule of the joints are often enough for a fixed quote. If the job needs a look first, we will arrange a site visit.

Around Broad Green

Recent enquiries here include premises near Elmwood Infant School, The Half Moon pub and The Archbishop Lanfranc School and the streets around them. You’ll also find Harris Invictus Academy Croydon (0.5 miles south), Waddon Ponds (1.3 miles south-west) and Church of St Saviour (under half a mile north-east). The closest station to Broad Green is West Croydon station, about 0.6 miles south. Nearby you’ll also find Centrale Croydon (0.8 miles south) and Croydon University Hospital (under half a mile north-west). For a walk, there’s Duppas Hill and Biggin Wood.

Where commercial joints are in CR90

From Broad Green and Old Town outwards, CR90 has a broad spread of commercial premises: shops, offices, hotels, restaurants and units. Because we cover all of it, multi-site occupiers can bring every building under one quote.

London and the South East are among the drier parts of the UK, though outside work in CR90 still waits for dry faces, and cold mornings bring frost and condensation on steel and glass.

Broad Green: Offices and shops close to stations such as West Croydon station, 0.6 miles south of Broad Green, tend to be busy all day, so sealant work is planned around opening hours. Sites a few miles apart, such as Pilton Industrial Estate and Thornton Road Industrial Estate, can share one programme and one point of contact.

Building owners, agents and FMs in CR90

When you manage a building on behalf of an owner, you need clear quotes and clear reporting. We quote a fixed sum, confirm the scope and walk the finished work with you or your representative, plus a 12-month guarantee.

Housing associations and managing agents often need work done across blocks and communal areas. We phase the work so people keep access, with each stage agreed with your site contact.

When to bring in a specialist

A short, simple internal joint is often within reach of a maintenance team. Where it goes wrong is preparation: new sealant over old, damp or dusty faces, or the wrong product for the movement.

What you see is the finished bead, but most of the work is hidden. Correct depth, the right primer and a sealant matched to the movement are easy to get wrong without experience.

Why deal with it now?

Fixing joints complaint by complaint is a costly way to manage sealant. A planned programme groups work by building or area, cuts repeat visits and gives you a budget figure. We can help you prioritise, starting with the joints most likely to let water in.

Comparing quotes

  • The terms of the workmanship guarantee
  • Whether old or failed sealant will be cut out, not overlaid
  • Is depth set with backing rod, or bond-breaker tape in shallow joints?
  • Are they CHAS accredited or on Constructionline?

Different surfaces, different methods

Facade and cladding joints

Facade joints move every day as panels warm and cool. They need a sealant with the right movement capability, laid at the right depth. We confirm the access in place before we quote.

Fire-rated seals where specified

Not every penetration suits a sealant. Other products, such as collars, wraps and batts, are specified for different services, so we will flag it if the detail needs a different product.

What sets the cost

A fixed quote reflects the actual work. It allows for:

  • The total length or number of joints
  • Which sealant the job calls for
  • Removal of failed or old sealant
  • The site’s rules and procedures

The price depends on the quantity of joints, what has to come out first and the access. Call for a quote once you have the details.

What we need to price the job

A good diagnosis starts with the right details. Tell us:

  • Where the site is, with the postcode
  • Photos of the joints, close up and from further back
  • Any dates the work must fit around
  • Approximate linear metres or a joint schedule

If there’s a specification, drawings or a tender package, send it with your enquiry, and we’ll price against exactly what is specified. For smaller jobs, photographs and a description will do.

Common questions from CR90 clients

How many days will you need on site?

The duration is planned around your programme and the access we are given. You’ll have an expected duration with the quote.

Will you just go over the old sealant?

No. Failed sealant is removed and the faces cleaned back to sound, dry material first, because fresh silicone will not bond with aged silicone.

Does commercial sealant work come with a guarantee?

Each job sits under our 12-month guarantee. Keeping joints clean and inspected helps them last well beyond that.

How long before the joints can be used?

We’ll confirm how long the chosen product needs to cure, and flag anything to keep off until it has cured.

Can you supply RAMS and insurance details?

Send your site requirements with the enquiry, and we’ll confirm the RAMS, insurance and CSCS details with the quote. From you, we will need the asbestos information for older buildings and any site rules.

What do you need from us to quote?

Start with whatever information is to hand. We follow up with questions or a visit where needed, and then a fixed quote for the agreed scope.

How do you choose the sealant?

Where there’s a specification, we use the product it names. If not, we choose for the movement, the surfaces and the conditions, in line with the manufacturer’s guidance.

Accreditations

Trusted. Accredited. Insured.