The Mastic Doctor team standing beside their branded vans outside an office building
Shetland Islands · Scotland

Floor Joint Sealing in Mid Yell

Floor joint sealing and filling in warehouses, factories and industrial units in Mid Yell. CHAS accredited, Constructionline member, with a 12-month guarantee on workmanship.

  • Chipped and spalling edges along forklift routes
  • Grimy joint lines spoiling a showroom floor
  • Filler that has parted from one face
1
Send details
Photos, drawings or a schedule, or we visit.
2
Get a quote
A fixed quote for the work, with the scope in writing.
3
We seal
Failed joints cut out, faces prepared, new sealant laid.
4
Guaranteed
Our workmanship is guaranteed for 12 months.
South East, London & Scotland
CHAS accredited
£5m PL insurance

Floor joint sealing near Mid Yell

Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.

For managing agents and facilities managers

For main contractors, we work as the sealant subcontractor, on new build and refurbishment alike. Programme, specification and site rules come first.

Planned maintenance programmes are welcome: working through a building or an estate in stages that fit your budget. Mid Yell can form part of a wider programme across the Shetland Islands.

Floor joint sealing in Mid Yell

For sites in Mid Yell and across the Shetland Islands, the process is short: send details, get a fixed quote, we seal, and the work is guaranteed. Approximate joint lengths, a few photos and a floor plan are enough for a quick quote, or we can arrange a site visit. Most enquiries involve brittle joint filler breaking up and soft sealant dragged out of trafficked joints, on loading bays, forklift and pallet-truck routes and retail and showroom floors. A single leaking joint is often how a building in Mid Yell first comes to us: we look at the rest while we are there and tell you what we find.

For outside joints near Mid Yell, the Scottish weather sets the timetable: sealant needs a dry joint and a temperature within its range. Inside slabs aren’t affected and can be scheduled around the occupier.

Every job ends the same way: guaranteed. You get a 12-month guarantee on our workmanship, and we explain exactly what that covers when we quote.

Location
Mid Yell (ZE2)
Wider area
Shetland Islands
Guarantee
12 months on our workmanship
Quotes
Fixed quote, scope in writing
Telephone
01277 525 020
Last updated
3 November 2026
The Mastic Doctor team beside their liveried vans in front of an office building

How the job changes by surface

Construction joints

Day joints vary, with or without armoured edges. We’ll tell you if the edges or any armouring look like they need attention before filling.

Forklift and pallet-truck routes

Open route joints are hard on equipment and drivers. Filling them gives a smoother run and saves the edges.

Where floor joints take the most wear near Mid Yell

With the shore within about 1 mile, Mid Yell counts as a coastal location. Near the sea, external slabs, ramps and decks see salt air and driven rain as well as their usual loads, so a failed joint lets more in and the edges break up sooner. Being in the east of Scotland, Mid Yell gets less rain than the west coast. Frost and de-icing salt still find their way into open external joints. Sealing them before winter limits the damage.

For floors and slabs around Mid Yell, the product is chosen for the traffic and the movement at each joint.

Mid Yell is in the Shetland Islands. Anywhere in ZE2, it works the same way: details in, fixed quote out, then sealing and a 12-month guarantee. Our the Shetland Islands coverage takes in 63 places, from busy centres to rural villages.

We take on floor joints across the ZE2 postcode area, for business premises of every kind. For a building on Links House, Sunny Side and Burrapark or nearby, we can quote for floor joints. Close to Mid Yell, our area also takes in Camb (1 mile north), Aywick (3 miles south), Houbie (7 miles east), Burravoe (7 miles south) and Clivocast (8 miles north-east). Island and remote sites need extra planning, with travel, ferry crossings where needed and weather to allow for, so give the site location in your enquiry.

What’s near Mid Yell

Open spaces near Mid Yell include White Hill of Vatsetter and Loch of Vatsetter.

Map of Mid Yell © OpenStreetMap contributors

Site staff or a sealant specialist?

The visible bead is only part of the job. Backing rod, primer where specified and a joint designed to move with the building are where general trades tend to cut corners.

Putting right a botched joint often costs more than sealing it well at the start, since all of it has to come out and the faces be cleaned back again. For that reason, many FMs and contractors use a sealant specialist from the outset.

What we are called out for in Mid Yell

Oil, laitance, dust and old cleaning chemicals build up inside joints. If the faces aren’t taken back to clean concrete first, the new material simply lifts out.

Clients typically get in touch after noticing something like this:

  • Failing joints at loading bays and dock doors
  • Chipped and spalling edges along forklift routes
  • Sealant pulled out along a truck route
  • A gap opening alongside old joint filler

For a school such as Mid Yell Junior High School, playground and building joints can be done in the holidays.

What to look for in a quote

  • The named product and why it was chosen
  • Proof of insurance
  • What site paperwork they can supply
  • Whether primer will be used where the manufacturer specifies it

How to choose a sealant contractor

Questions we’re asked in Mid Yell

Can you take on a job in Mid Yell, on the island?

Yes. Islands are part of our area, Mid Yell included. We plan island jobs around the ferry and the forecast, and bring everything the job needs on the first crossing.

Our building in Mid Yell is near the coast: does that change the sealant?

It can. Coastal exposure works external joints harder than inland weather. We choose the product for the exposure, prime where the manufacturer requires it and size the joint for its movement.

Why has the filler pulled away from one side?

Young concrete carries on shrinking for a long time and a stiff filler can separate down one side. It is usually dealt with by topping up.

Do your applicators hold CSCS cards?

Yes. Our applicators hold CSCS cards, as many construction sites ask for.

Are you CHAS accredited and on Constructionline?

Yes. We are CHAS accredited and a Constructionline member.

What happens if the joint edges are damaged?

We check the edges as part of the survey. Damaged edges are flagged up front, so nothing is filled that won’t hold.

Will we need to close the floor?

Typically only the zone we are working in has to close. Each zone reopens when the product can take traffic, then we move to the next.

What happens if it’s left?

Holding off until the whole floor can close can take a long time. Phased in zones, the busiest routes can be treated first and the remainder follows on a plan that suits you. In Scotland, wind-driven rain finds a failed joint quickly, so it’s worth renewing joints around Mid Yell before they leak.

The product called for affects the cost, as does the preparation each joint needs. Access, phasing and site requirements come into it too.

Why appoint us

  • Work carried out by CSCS-carded applicators
  • Public liability insurance in place
  • Constructionline member
  • Sealing commercial buildings since 2005

See our cost guide or how we’re accredited.

Our process

On arrival, we sign in, go through any site induction and check how permits are handled. Floors, finishes and fittings next to the joints are covered before anything is cut or cleaned, and the work typically takes anything from a day for one loading bay to several days for a large floor, split into phases. Travel to smaller Scottish places like Mid Yell is planned so the job is finished in one visit where possible, so photos, sizes and a full list matter. External joints need a dry spell as well.

  1. We agree the traffic routes and phasing with your site team.
  2. Any joints with broken edges are flagged before work starts.
  3. We clear each run back to clean concrete.
  4. We fill the joints with the agreed product, finished level.
  5. You get a time for each zone to reopen.

Getting the site ready

  • Point out any areas we must not close
  • Let us know about inductions and permits
  • Tell staff and tenants when we’ll be in

Request a quote

Quotes are fixed against the scope you send, so you know the figure before anyone is on site. To ask for one, phone 01277 525 020 or email us.

Ask for a quote

Related advice

Accreditations

Trusted. Accredited. Insured.