Expansion joint sealing in Pierowall
Expansion joint sealing for Pierowall, from a contractor working since 2005. Fully insured and CHAS accredited.
- Expansion joints split through the centre of the bead
- Leaks through car park deck joints onto the level below
- Brittle, chalky sealant on external joints
Expansion joint sealing near Pierowall
Photos, a specification or a quick description of the joints is enough to start a fixed quote.
How we handle expansion joint sealing in Pierowall
If you need expansion joint sealing in Pierowall, start with photographs and joint lengths. We will come and look where photos don’t show enough before issuing a fixed quote. You can also give us a call on 01277 525 020 or email us to talk the joints through. If you have debris jammed in movement joints and water getting into the wall through a failed joint, we can put it right, on cladding panel joints, podiums and floor movement joints and precast concrete panel joints alike. Sealant contractors, mastic applicators, sealant specialists: whatever the job title on the order, the work in Pierowall is the same: the right product in a properly prepared joint.
Weather windows decide external joint work around a place like Pierowall: dry faces and the right temperature are essential, so dates have some give. Internal floors can be done whenever suits the site.
The 12-month guarantee is for workmanship rather than wear and tear. Sealant wears with time, and movement, weather, cleaning and use decide how fast, so we spell out the cover before we begin.

- Where
- Pierowall (KW17)
- Wider area
- Orkney Islands
- Guarantee
- A 12-month guarantee
- Quotes
- A fixed quote before we start
- Phone
- 01277 525 020
- Page updated
- 3 November 2026
Site staff or a sealant specialist?
What you see is the finished bead, but most of the work is hidden. Backing rod, primer where specified and a joint designed to move with the building are easy to get wrong without experience.
Using site staff can make sense for a small touch-up, but larger jobs are different: a specialist brings efficiency, a consistent finish and a 12-month guarantee.
Towns and villages near Pierowall
Also in Pierowall
Commercial clients in Pierowall
Planned maintenance programmes are welcome: working through a building or an estate in stages that fit your budget. Sites in Pierowall can sit alongside others in a wider programme across the Orkney Islands.
Agents, factors and owners’ representatives all follow the same route: send details, get a fixed quote, we seal, guaranteed. We can agree access arrangements and keyholder contacts beforehand.
How the job changes by surface
Cladding panel joints
Metal and composite panels shift considerably as temperatures change. The joints need a low-modulus sealant with enough movement capability in a colour confirmed for that product.
Internal floor movement joints
Floor joints include saw-cut joints and construction joints. Trafficked floor joints often get a semi-rigid filler, with a flexible sealant where movement is larger.
Questions about Pierowall
Will you travel to Pierowall on the island?
Yes. Islands are part of our area, Pierowall included. We plan island jobs around the ferry and the forecast, and bring everything the job needs on the first crossing.
Must our site in Pierowall stop work while the joints are done?
In the majority of cases the site keeps working. Joints are done in phases, a bay, aisle or deck at a time. The phasing plan comes with the quote.
Are your applicators CSCS-carded?
Yes. We use CSCS-carded applicators, which many sites require.
Do you guarantee expansion joint work?
It’s backed by our 12-month guarantee. Tell us straight away if a joint we sealed gives trouble in that time.
What causes movement joint sealant to fail?
Normally the joint is moving more than the sealant can take. That’s why we check width, depth and movement class before quoting.
Will you quote for a small job?
Small jobs are welcome alongside larger packages. Send details for a fixed quote.
Can staff carry on working while you’re here?
In most cases, yes. Phased work can be planned so areas stay in use, with each area protected and signed.
How a job runs
We schedule the visit to fit the site hours and access windows you give us. While we are working, the area stays contained and tidy, and your contact hears from us before we move to the next area. Jobs near Pierowall are often grouped with others in the same area, to make the most of each trip. Let us know if your dates have any give.
- First the joints are inspected, widths measured and the type of failure noted.
- You receive a fixed quote stating the product and the movement it is rated for.
- Where areas have to stay open, we agree a phased sequence before starting.
- The failed seal is cut out and both joint faces cleaned back to sound material.
- Depth is controlled with backing, the faces are primed where the maker calls for it, then the bead is laid and tooled.
- We check each joint with you, confirm the cure time and sign off under our 12-month guarantee.
Before we start on site
- Confirm the product named in the specification
- Agree which areas must stay open
- Arrange parking or a loading space
Ask for a quote
Quotes are fixed against the scope you send, so you know the figure before anyone is on site. To start the process, give us a call on 01277 525 020 or email a schedule or drawings.
Read more
Traffic, movement and joints around Pierowall
With the shore within about 1 mile, Pierowall counts as a coastal location. Near the sea, external slabs, ramps and decks see salt air and driven rain as well as their usual loads, which is why split joints are worth sealing before the edges deteriorate. Work on Pierowall has to fit the ferry timetable and the forecast. Send joint sizes and details of the traffic so the right materials come on the crossing.
A joint near Pierowall that has lost its sealant lets in water and grit, and the edges suffer next; we will tell you if the edges need repairing first.
Pierowall is about 24 miles north of Kirkwall, in the Orkney Islands. Commercial clients in Pierowall use us for work on movement joints. We work across 51 places in the Orkney Islands, from busy centres to rural villages.
We take on movement joints across the KW17 postcode area, whatever the building. Among the streets we cover are Gillpier Road, Howanbrek and Hirstquoy. If your building is just outside Pierowall, we cover Rackwick (1 mile north), Brinian (13 miles south), Broughtown (14 miles east), Evie (15 miles south) and Lady (16 miles east). Pierowall ranks among the main centres of the Orkney Islands, with offices, shops, schools and other public and commercial buildings, and we cover them all. Where a site is remote or on an island, we plan travel and materials carefully.
Around Pierowall
Well-known places in the area include Noltland Castle (1 mile west). The countryside around Pierowall includes North Hill RSPB reserve and Loch Saintear.
When it isn’t the sealant
A proper diagnosis includes knowing what sealant can’t do. We will tell you if the real problem is one of these:
- Concrete or masonry repairs along the arrises
- Failed waterproofing membranes on podiums, roofs or decks (a waterproofing specialist’s job)
- Joints too narrow for the movement, which need redesigning by the engineer
If you are not sure, just speak to us on 01277 525 020 or send photos by email and we will give you a straight answer.
Where we work in Pierowall
- Podiums and floor movement joints
- Cladding panel joints
- Brickwork movement joints
- Blockwork control joints
- Car park decks and ramps
- Precast concrete panel joints
Common problems we fix in Pierowall
Repeated failure often traces back to the wrong product. A stiff or general-purpose sealant across a joint with large movement won’t cope. Movement capability is set out in BS EN ISO 11600, and specifications often refer to it.
Any of the following is a good reason to get the joints checked over:
- Sealant peeling off one face of the joint
- Water dripping through deck or ramp joints
- Expansion joints filled with dirt and stones
- Hardened, cracked sealant on exposed facades
In and around Pierowall, the right filler or sealant for each joint depends on the traffic and the movement it takes.
What to look for in a quote
- Their pre-qualification and accreditations
- Which product they’ll use, and why it suits the joint
- Will RAMS and insurance details be available?
- Whether old or failed sealant will be cut out, not overlaid