The Mastic Doctor team standing beside their branded vans outside an office building
Aberdeen · Scotland

Construction Mastic in Rubislaw

Mastic packages for new-build and refurbishment projects throughout Rubislaw and nearby, by CSCS-carded applicators. CHAS accredited and fully insured.

  • Old sealant on a refurbishment that needs stripping before new work
  • Early adhesion failures on new external joints
  • Oversized or tapered gaps around new frames
1
Send details
Photos, drawings or a schedule, or we visit.
2
Get a quote
Scope agreed and priced before anything starts.
3
We seal
Failed joints cut out, faces prepared, new sealant laid.
4
Guaranteed
Signed off, with 12 months’ guarantee.
Covering the South East & Scotland
CHAS accredited
£5m PL insurance

Construction mastic near Rubislaw

Photos, a specification or a quick description of the joints is enough to start a fixed quote.

About our construction mastic in Rubislaw

Mastic tends to be one of the final packages before handover, so it lands at exactly the point the programme is tightest. We work as a mastic subcontractor to main contractors and developers with projects in Rubislaw. We work on internal decorators’ caulk, floor and skirting junctions and brick and block movement joints, and the failures we are asked to look at most are oversized or tapered gaps around new frames and caulk cracking where joints are moving more than expected. A single leaking joint is often how a building in Rubislaw first comes to us: we look at the rest while we’re there and tell you what we find.

Sandstone and, in Aberdeen, granite buildings need care when new windows or panels are sealed against them: the right primer, a neutral-cure sealant and a colour that blends.

Our workmanship is guaranteed for 12 months, wherever the site is. If a joint we sealed fails because of how it was installed, we come back and put it right.

The Mastic Doctor team standing beside their branded vans outside an office building
Place
Rubislaw (AB15, AB10, AB16)
Wider area
Aberdeen
Cover
12 months on every job
Quotes
Quoted before any work starts
Phone
01277 525 020
Page updated
3 November 2026

When to call us in Rubislaw

Most mastic snags on new buildings come from sequencing rather than product. Sealing before decorators, flooring or other trades have finished leaves joints exposed to damage, and the joint has to be redone.

Typical triggers for a call:

  • A mastic package split between trades with no clear owner
  • Early adhesion failures on new external joints
  • Bath and shower joints scraped during the final clean
  • Cracks opening in caulked internal joints

Hospital estates such as Albyn Hospital, 0.8 miles east of Rubislaw, tend to grow and change in phases, often next to occupied wards, so facade and perimeter sealing has to fit the estates team’s plan.

What your quote should include

  • Whether primer will be used where the manufacturer specifies it
  • Can the work be phased to keep areas open?
  • Whether old or failed sealant will be cut out, not overlaid
  • Their pre-qualification and accreditations

How to choose a sealant contractor

Why act early in Rubislaw

Some packages split mastic across the window fitter, kitchen fitter and plumber. The result tends to be uneven finishes and arguments about who should seal what. One mastic subcontractor for the lot keeps it simple. In Rubislaw, as across Scotland, rain finds any gap, so a split or hardened joint lets water into the wall. Resealing promptly protects the stone and the interior.

Cost follows what’s involved: stripping out, preparation, sealing, access and phasing. Call for a quote and we’ll explain how it’s made up.

Why clients in Rubislaw choose us

  • One phone line for London, the South East and Scotland
  • Colours chosen to suit frames, cladding or finishes where possible
  • Clear, fixed quotes
  • CSCS-carded applicators

Read what affects the cost and how we’re accredited.

Building owners, agents and FMs in Rubislaw

For main contractors, we work as the sealant subcontractor, on new build and refurbishment alike. Programme, specification and site rules come first, and our applicators hold CSCS cards.

Facilities managers want contractors who arrive with the paperwork sorted. Tell us what site paperwork you need, such as RAMS, an insurance certificate or CSCS details, and we’ll confirm with the quote.

From enquiry to sign-off

In a busy building, the work is phased so only one area is out of use at a time. Each area is protected, prepared and sealed before the next one starts. Give us the access times and building rules for your premises in Rubislaw, so the work can be phased and areas kept in use.

  1. Drawings, the sealant specification and your programme come to us for pricing.
  2. A fixed quote sets out the scope, the products and the sequence.
  3. Any site paperwork you need (RAMS, insurance certificate, CSCS details) is confirmed with the quote.
  4. We seal each plot or floor as it’s released to us.
  5. Each joint is prepared, backed to depth and sealed in the product the specification names.
  6. We close out snagging and hand over with a 12-month guarantee.

Before we start on site

  • Point out parking and an unloading spot
  • Tell staff and tenants when we will be in
  • Send asbestos survey details if the building is pre-2000

Request a quote

Photos, drawings or a schedule of the joints and a fixed quote comes back to you. Where a site visit makes more sense, we’ll arrange one.

Get a quick quote

Advice

After the work

A few simple habits keep the new joints working:

  • Keep finished joints away from paint, plaster and scrapers
  • Plan external elevations with the weather in mind
  • Bring the mastic contractor in after the last trades are through
  • Put any product change through the designer first

At handover, keep the product details with the O&M information. That helps the building owner maintain the joints later and avoids guesswork when joints are renewed. We can confirm the handover information you need when we quote.

One unsealed frame can let water into finished internal areas. On a new building that means remedial work after decorating and possibly a delayed handover. Checking perimeters before internal finishes go on avoids it.

Mastic packages on Rubislaw sites

Rubislaw sits close to the coast, within about 3 miles. Coastal exposure means perimeter and cladding joints work harder than on an inland job, so joint design, primers and product choice deserve extra care. Rubislaw has a good number of hotels close by, all within 2 miles. Hotel schemes tend to have fixed reopening dates, so the mastic is programmed tightly with the other trades.

New units and refits on sites such as Whitemyres Business Centre, 0.9 miles to the north-west of Rubislaw, need their panel and perimeter joints sealed to the specification. School extensions, at buildings such as Albyn School, typically run to the summer holidays, mastic included.

Rubislaw is about 1 mile south-west of Aberdeen, in Aberdeen. Across the AB15 postcode area, the process is the same: details in, fixed quote out, then sealing and a 12-month guarantee. Our Aberdeen coverage takes in 40 places, large and small.

We take on mastic packages across the AB15, AB10 and AB16 postcode area. Streets here include Forest Road, Harlaw Road and Bayview Road. With the A9119 nearby, Rubislaw is easy to get to with materials and equipment. Close to Rubislaw, our area also takes in Midstocket (1 mile north), West End (1 mile south), Queen's Cross (1 mile east), Summerhill (1 mile north-west) and Craigiebuckler (1 mile south-west). Bigger towns within reach include Dyce (5 miles north-west), Cove Bay (3 miles south-east), Bucksburn (3 miles north-west), Peterculter (6 miles south-west), Kingswells (3 miles west) and Milltimber (4 miles south-west).

Around Rubislaw

Recent enquiries here include premises near Rubislaw and Queens Terrace Gardens, Airyhall Primary School and North East of Scotland Music School and the streets around them. The closest station to Rubislaw is Aberdeen station, roughly 1.6 miles east of the centre. Other landmarks nearby include Trinity Centre (1.5 miles east) and Gordon Highlanders Museum (0.5 miles south-west). Open spaces near Rubislaw include Rubislaw Quarry and Gallows Hill.

Map of Rubislaw © OpenStreetMap contributors

When to bring in a specialist

Site maintenance staff can often handle a short internal joint. Where it goes wrong is preparation: new sealant over old, damp or dusty faces, or the wrong product for the movement.

The visible bead is only part of the job. Correct depth, the right primer and a sealant matched to the movement are easy to get wrong without experience.

Questions we are asked in Rubislaw

Can you work at a site such as Whitemyres Business Centre, by Rubislaw?

Yes, sites like Whitemyres Business Centre are within our area, along with the rest of Rubislaw. Send details of the unit and the work through our quote form for a quick quote.

Can work at a site such as University of Aberdeen - Foresterhill Campus fit around teaching?

Yes. We plan campus work around teaching, exams and residence turnarounds. Tell us which site documents you need, such as RAMS, our insurance certificate or CSCS details, and they’re confirmed with the quote.

When can the area be used after sealing?

The product and site conditions decide that. Some take light use quickly, others need longer to cure, so we’ll confirm the curing time on the day.

Can you work plot by plot or floor by floor?

We seal plot by plot or floor by floor as areas are released. The sequence is agreed with the site manager at the start.

How long will the new sealant last?

There’s no fixed lifespan: movement, exposure, cleaning, traffic and the product all play a part. Sealant joints are maintenance items, so inspect them regularly.

What happens if the weather stops external sealing?

Outside, the joint has to be dry and the temperature within the product’s limits. Frosty or damp mornings can hold up external sealing, so internal areas are often done on those days.

What guarantee comes with a mastic package?

It’s backed by our 12-month guarantee on the workmanship. Keeping other trades off finished joints prevents most problems.

Accreditations

Trusted. Accredited. Insured.