The Mastic Doctor team standing beside their branded vans outside an office building
Kent · England

Industrial and floor joint sealing in Strood, Kent

Looking for floor joint sealing in Strood? It’s simple: send details, get a quote, we seal, guaranteed.

  • Filler that has parted from one face
  • Untidy open joints in a retail unit
  • A rough ride across broken joints
1
Send details
Drawings, photos, a joint schedule or a site visit.
2
Get a quote
A fixed price, with what’s included set out clearly.
3
We seal
CSCS-carded applicators, the right product for each joint.
4
Guaranteed
12-month guarantee on our workmanship.
South East, London & Scotland
Constructionline member
Fully insured: £5m PL

Need floor joint sealing in Strood?

Photos, a specification or a quick description of the joints is enough to start a fixed quote.

Common questions from Strood clients

Can you work at a site such as Business Park, by Strood?

Yes, sites like Business Park are within our area, along with the rest of Strood. Photos and a short description are enough for a first look.

Would you work within a site like West View Hospital?

Yes, provided the work is planned with the site’s estates team. Work is phased so departments keep running, under the site’s own rules.

Why is there a gap next to the joint filler?

It can be shrinkage, contamination on the joint faces or a product unsuited to the movement. We look at which it is before recommending anything.

Does the weather affect the work?

It can, when the joints are outside. Sealant won’t bond properly to a wet or frosty joint, so we watch the forecast and rearrange outside work if we have to. Internal work is far less affected.

Are you insured?

Yes. We are fully insured, including public liability cover.

What happens if old sealant might contain asbestos?

The duty to manage asbestos sits with the building’s dutyholder, so we’ll ask for the register before work on an older building. Work pauses if suspect material is found, until it has been tested.

How long does a job like this take?

It depends on the scope, but the work typically takes between a day and a number of days, set by the joint lengths, the edge condition and the phasing you need. Larger or phased jobs take longer, and we’ll give you a timescale with the quote.

Floor joint sealing in Strood, done properly

We have been sealing commercial joints since 2005. Our CSCS-carded applicators follow your site induction and rules, and we are CHAS accredited and a Constructionline member holding public liability insurance. Completed joints come with a 12-month guarantee on our workmanship. We work on construction joints, saw-cut induced joints and forklift and pallet-truck routes, and the failures we’re asked to look at most are soft sealant dragged out of trafficked joints and grimy joint lines spoiling a showroom floor. Most enquiries from Strood start with one failed joint and grow into a wider look at the building: we check the joints around it and give you an honest view of what needs doing now and what can wait.

Smaller community and commercial buildings around Strood have their own movement joints in walls and floors. They’re easily forgotten until water gets in or an edge breaks.

The 12-month guarantee is for workmanship rather than wear and tear. Sealant wears with time, and movement, weather, cleaning and use decide how fast, so we’re clear about what is covered before work starts.

Mastic Doctor team members lined up next to their branded vans outside an office building
Place
Strood (TN17)
Region
Kent
Cover
12 months on every job
Price
Quoted before any work starts
Call
01277 525 020
Last updated
3 November 2026

When to call us in Strood

Soft sealant in a heavily trafficked joint gives the edges little support and the edges fail regardless. The opposite mistake happens as well: a stiff filler in a joint that keeps moving splits or comes away from the sides.

Any of the following is a good reason to get the joints checked over:

  • Soft sealant dragged out of trafficked joints
  • Grimy joint lines spoiling a showroom floor
  • Trucks and loads jolting over damaged joints
  • Failing joints at loading bays and dock doors

In a school such as Rolvenden Primary School, movement joints in brick, block and hall floors tend to be forgotten until they leak.

Comparing quotes

  • Whether primer will be used where the manufacturer specifies it
  • Whether their applicators hold CSCS cards
  • The terms of the workmanship guarantee
  • Their pre-qualification and accreditations

Questions to ask before you appoint anyone

How a job runs

When we get to site, we report to your site contact and complete whatever induction the building runs. Floors, finishes and fittings next to the joints are covered before anything is cut or cleaned, and the work usually takes between a day and a number of days, set by the joint lengths, the edge condition and the phasing you need. Rural sites near Strood may need directions, gate codes or a contact on site. Send that with the details and we will confirm the plan with the quote.

  1. A floor survey records every joint, its edges and what crosses it.
  2. The treatment and the zones are set out in a fixed quote.
  3. Old fill and packed debris come out until both faces are sound.
  4. Dust is vacuumed out and primer applied where specified.
  5. The joint is filled to its specified depth and trimmed level.
  6. We hand each phase back when it can take traffic.

What we need from you

  • Share the asbestos register for older buildings
  • Tell us what induction or permit system the site runs
  • Tell staff and tenants when we will be in

Getting a fixed quote

For a fixed quote, ring 01277 525 020 or send details through our quote form, telling us the site location and the nature of the job. You can also send details through our quote form.

Get a quick quote

Read more

How the quote is worked out

Sealant work doesn’t have a standard rate, since sites vary so much. What we look at:

  • Backing rod, priming and other preparation
  • Whether the work must be split into stages
  • Quantities, in metres or numbers
  • The product specified

Cost follows what’s involved: stripping out, preparation, sealing, access and phasing. Call for a quote and we will explain how it’s made up.

Details that help us quote

For an accurate fixed quote, we need to understand the site. Useful things to include:

  • The asbestos register, for older buildings
  • Any dates the work must fit around
  • What the building is and how it’s used
  • Rough lengths or quantities, or drawings if you have them

Quotes are fixed against the scope you send, so the cost is agreed before work starts. To start the process, call 01277 525 020 or use the quote form.

Floor joint sealing in Strood: the local picture

Two named trading, business or retail sites lie within about 3 miles of Strood. That puts plenty of warehouse floors, service yards and car parks close by, all with joints under traffic. Central London is about 44 miles from Strood. The roads out of London are lined with trade parks and distribution sheds.

Sites like West View Hospital (to the east of Strood) carry ambulances, deliveries and visitors’ cars over their road and deck joints. Another example is Pickhill Business Centre, 1.9 miles to the east of Strood, where floors and yards would be done in stages around the occupiers.

Strood is about 11 miles south-west of Ashford, in Kent. We cover Strood and the rest of Kent, with the same fixed quotes and 12-month guarantee as everywhere else. 931 places across Kent fall within our area, including Strood. Our Brighton page has more on work in that area, about 37 miles away.

Commercial sites across TN17 are covered. We cover commercial and managed buildings on Rolvenden Hill and Tenterden Road and the roads nearby. Nearby places we also cover include Rolvenden (1 mile south-west), Rolvenden Layne (1 mile south), West Cross (1 mile west), Parkgate (2 miles north) and Broad Tenterden (2 miles east) for floor joints. Bigger towns within reach include Maidstone (15 miles north), Ashford (11 miles north-east), Paddock Wood (14 miles north-west), Bearsted (15 miles north), Park Wood (13 miles north) and Kennington (13 miles north-east).

Local landmarks in Strood

Locally, jobs take us to sites close to Turners Field and Homewood School and Sixth Form Centre. Other landmarks nearby include The C.M Booth Collection (1 mile south-west) and Benenden Hospital (2.4 miles north-west).

Map of Strood © OpenStreetMap contributors

Maintenance after handover

Sealant joints are maintenance items, and their life depends on movement, exposure, cleaning and use. Our advice:

  • Remind operators to lift rather than drag
  • Expect fillers on young slabs to need a top-up
  • Keep trucks off new joints until we say they’re ready
  • Walk the main routes and inspect joint lines on a regular cycle

Problems inside the 12-month guarantee period are ours to put right. Beyond that, an inspection once or twice a year catches failing joints early.

While the concrete edges are intact, it’s a filling job. After the edges go, repairs come into it, with more downtime and more disruption.

Honest limits

Some faults sit outside our scope, and we say so rather than covering them up:

  • A floor that rocks at the joints, which needs a structural fix
  • A failing floor coating, which is a flooring contractor’s job
  • Broken concrete either side of the joint

If in doubt, call the office on 01277 525 020 or email a schedule or drawings and we’ll say what we think before you book.

Where we work in Strood

  • Loading bays
  • Retail and showroom floors
  • Joints along racking aisles
  • Forklift and pallet-truck routes
  • Construction joints
  • Saw-cut induced joints

When to bring in a specialist

For most general trades, sealant is a sideline. A specialist prepares properly, controls joint depth and picks a product with the right movement class, which is what makes a joint last.

Paperwork matters too. Main contractors and clients often ask for CSCS cards, RAMS and insurance details, and our CSCS-carded applicators are used to working under those rules.

Accreditations

Trusted. Accredited. Insured.