
Port na Craig floor joint sealing
Work needed on a floor joint in Port na Craig? We assess it, carry out the work and guarantee our workmanship for 12 months.
- Filler that has parted from one face
- A rough ride across broken joints
- Broken arrises where pallet trucks cross
Floor joint sealing across Port na Craig
Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.
Floor joint sealing in Port na Craig
Open joints take a beating from forklift and pallet-truck wheels. Every pass chips at the bare concrete edge until a crisp saw cut becomes a wide, broken groove. Filling the joint properly gives the edges back their support, which is kinder to trucks, loads and operators. If you’re dealing with joint edges breaking up under truck wheels and cracked and crumbling joint fill, we can help, whatever the surface. Whether you call it commercial sealant work, mastic application or joint sealing, in Port na Craig it comes down to the same thing: the right product in a properly prepared joint.
Travel to smaller places like Port na Craig is planned so the work is done in one trip where possible. Send photographs, joint widths and details of the traffic first.
Work we carry out comes with a 12-month guarantee. Should something we installed fail, speak to us on 01277 525 020 or send photos by email and we will come back to it.

- Place
- Port na Craig (PH16)
- Wider area
- Perth and Kinross
- Guarantee
- 12 months on every job
- Quotes
- A fixed quote before we start
- Telephone
- 01277 525 020
- Updated
- 3 November 2026
General trades versus a specialist
Certain joints really need a specialist: fire-rated seals that must follow a tested detail, trafficked floor joints and external movement joints among them. Getting these wrong usually costs more in the end than doing them right.
There’s also the paperwork. Main contractors and clients often ask for CSCS cards, RAMS and insurance details, and our CSCS-carded applicators are used to working under those rules.
How the job changes by surface
Semi-rigid joint fillers
A semi-rigid fill can separate along one side while a slab is still shrinking. That is normally dealt with by topping up later and we’ll flag it at quote stage.
Construction joints
Where a day joint crosses a truck route, its edges take heavy punishment. Movement and traffic are both checked before we decide what goes in.
Our process
We begin with a short walk round with whoever looks after the building, to confirm the scope, the order of work and any areas we must keep clear. Then we strip out anything that has failed, prepare every joint and seal it. For a building near Port na Craig, directions, keys and a contact on the day are worth sorting early. We’ll confirm the plan with the fixed quote.
- First comes a walk of the floor to record joint sizes, broken edges and traffic routes.
- A fixed quote follows, listing the treatment for each area and the order of work.
- Old filler, debris and contamination are cut or routed out back to clean concrete.
- Dust is sucked out of the joint and a primer used if the product data sheet asks for one.
- Filler or sealant goes in to the right depth and is finished flush with the slab.
- We tell you when each zone can carry trucks again and move on to the next.
What we need from you
- Tell us your opening times and when work is allowed
- Point out any areas we must not close
- Confirm the product named in the specification
Quotes
For a fixed quote, speak to us on 01277 525 020 or send photos by email, telling us the site location and the nature of the job. You can also send details through our quote form.
Related advice
FAQs: Port na Craig
Does your area include sites such as Fonab Business Park, near Port na Craig?
Yes. Our area takes in Port na Craig and its surroundings, with estates and business parks such as Fonab Business Park included. Send details of the unit and the work through our quote form for a quick quote.
Can you work on a hospital site such as Pitlochry Community Hospital?
Yes, provided the work is planned with the site’s estates team. Before anything starts, the estates team agrees permits, inductions and infection-control measures with us.
Are your applicators CSCS-carded?
Yes. Should the site need card details in advance, let us know and we’ll send them with the quote.
Are you CHAS accredited and on Constructionline?
Yes. We’re CHAS accredited, we’re a Constructionline member and we use CSCS-carded applicators.
How soon can traffic go back on the floor?
Cure times vary with the product and how cold the slab is. We’ll give you a time for each zone before we start.
Do you guarantee industrial floor joints?
A 12-month guarantee covers the work we do. It applies to our workmanship rather than structural movement or accidental damage.
Do you repair broken joint edges?
A filler needs sound edges to grip. If the arrises have spalled, we’ll say they need repair before filling, so you can decide how to proceed.
Towns and villages near Port na Craig
Other services in Port na Craig
Looking after the joints
Keep the joints in good shape with a few simple steps:
- Respect the cure time before traffic returns
- Plan for a top-up on newer floors
- Record damaged joints with a photo and a location
- Treat loading bay joints first if they’re failing
On younger slabs, a fine line can open down one side of a filled joint as the concrete keeps shrinking. That is common and is usually dealt with by topping up once the slab has settled down.
Edges tend to break slowly at first, then quickly. Each chip makes the drop deeper and the next impact harder so early treatment saves a lot of trouble.
Signs you need floor joint sealing in Port na Craig
Older fills harden, shrink and crack with age especially under daily scrubbing and traffic. Once it has gone hard or come loose, it protects nothing.
Site and facilities staff are often the first to spot these:
- Unfilled floor joints collecting dirt and grit
- A rough ride across broken joints
- Loading bay joints breaking down
- Filler that has parted from one face
Parks like Fonab Business Park, under half a mile west of Port na Craig, combine paved areas, car parks and building elevations, each with joints that move.
Before you book anyone
- What site paperwork they can supply
- Whether primer will be used where the manufacturer specifies it
- What level of public liability insurance do they hold?
- Will CSCS-carded applicators be on site?
Joints that move: notes for Port na Craig
Port na Craig is on Scotland’s drier eastern side. Cold winters and gritting are hard on any yard or deck joint left open. Autumn is a sensible time to seal them. Less than 3 miles from Port na Craig there are two named estates and business parks. Floors, loading bays and yards on sites like these are where floor and movement joints work hardest.
Sites like Pitlochry Community Hospital (less than half a mile north of Port na Craig) carry ambulances, deliveries and visitors’ cars over their road and deck joints. Another example is Aldour Industrial Estate, 0.7 miles to the east of Port na Craig, where floors and yards would be done in stages around the occupiers.
Port na Craig is about 17 miles north-west of Blairgowrie and Rattray, in Perth and Kinross. We cover Port na Craig and the rest of Perth and Kinross, and jobs here get the same fixed quote and 12-month guarantee as anywhere else. Our Perth and Kinross coverage takes in 114 places, from busy centres to rural villages. We also cover Dundee, some 33 miles away.
We take on floor joints across the PH16 postcode area, for business premises of every kind. Among the streets we cover are Foss Road, Ferry Road and Bruach Lane, and sites on any of them can send details for a fixed quote. With the A924 nearby, Port na Craig is straightforward for us to reach. Just outside Port na Craig, we also work in Pitlochry (1 mile north), Moulin (1 mile north), Grandtully (3 miles south-west), Little Ballinluig (4 miles south-west) and Ballinluig (4 miles south-east).
What’s near Port na Craig
Recent enquiries here include premises near Faskally Forest and Dundarach Hotel, among other places. There’s a railway station in Port na Craig itself: Pitlochry station. Other landmarks nearby include Black Castle of Moulin (1 mile north-east) and Atholl Palace Museum (0.6 miles north-east). Green spaces nearby include Loch na Bà.
Commercial clients in Port na Craig
We take on planned maintenance as well as one-off repairs: resealing failed joints building by building, on a schedule that suits your budget. Sites in Port na Craig can sit alongside others in a wider programme across Perth and Kinross.
FMs need a contractor who is easy to get on site. Let us know the documents you need (RAMS, insurance certificate, CSCS details) and we will confirm them with the quote.