The Mastic Doctor team standing beside their branded vans outside an office building
Kent · England

Floor Joint Sealing in Dunton Green

Floor joint sealing and filling in warehouses, factories and industrial units across Dunton Green, carried out by CSCS-carded applicators. CHAS accredited and fully insured.

  • Untidy open joints in a retail unit
  • Failing joints at loading bays and dock doors
  • Joint fill separating from the concrete
1
Send details
Tell us about the site, with photos if you have them.
2
Get a quote
A fixed price, with what’s included set out clearly.
3
We seal
CSCS-carded applicators, the right product for each joint.
4
Guaranteed
Our workmanship is guaranteed for 12 months.
London, the South East & Scotland
CHAS accredited
£5m PL insurance

Floor joint sealing for businesses in Dunton Green

Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.

Site staff or a sealant specialist?

Site maintenance staff can often handle a short internal joint. Where it goes wrong is preparation: new sealant over old, damp or dusty faces, or the wrong product for the movement.

For most general trades, sealant is a sideline. A specialist brings correct preparation, depth control with backing rod and a product suited to that particular joint, which is what makes a joint last.

About our floor joint sealing in Dunton Green

Concrete floors in warehouses and factories are cut into bays with saw cuts and day joints, and every one of those joints is an exposed edge under hard wheels. Our job is to put the right filler or sealant into them for the loads and the movement they see, so the arrises are supported and grit stays out. Site teams most often ask us about unfilled floor joints collecting dirt and grit and brittle joint filler breaking up, on construction joints, retail and showroom floors and forklift and pallet-truck routes. Whether you call it commercial sealant work, mastic application or joint sealing, in Dunton Green it comes down to the same thing: the right product in a properly prepared joint.

Smaller community and commercial buildings around Dunton Green have their own movement joints in walls and floors. They’re easily forgotten until water gets in or an edge breaks.

Our workmanship is guaranteed for 12 months. If our installation lets you down in that time, we return and fix it.

Mastic Doctor team members lined up next to their branded vans outside an office building
Location
Dunton Green (TN13, TN14)
Wider area
Kent
Guarantee
12 months on every job
Quotes
A fixed quote before we start
Telephone
01277 525 020
Last updated
3 November 2026

Our process

The first thing on site is a walk round with your contact, to confirm the scope, the order of work and any areas we must keep clear. Then we strip out anything that has failed, prepare every joint and seal it. Rural sites near Dunton Green may need directions, gate codes or a contact on site. Send that with the details and we’ll confirm the plan with the quote.

  1. A floor survey records every joint, its edges and what crosses it.
  2. You receive a fixed quote showing products and phasing.
  3. Old fill and packed debris come out until both faces are sound.
  4. Dust is vacuumed out and primer applied where specified.
  5. Filler or sealant is placed to depth and finished flush.
  6. We hand each phase back when it can take traffic.

What we need from you

  • Flag any permit to work we’ll need
  • Arrange parking or a loading space
  • Send asbestos survey details if the building is pre-2000

Quotes

Every quote starts with the facts: the joints involved, quantities, access and the product called for. Share whatever details you have and we will fill any gaps with a visit.

Ask for a quote

Related advice

Why deal with it now?

Dirt and spillage gather in open joints, out of reach of the floor cleaner. Where the floor is on show or needs to be kept clean, that is a problem. Filled joints are far simpler to keep clean. For buildings around smaller places like Dunton Green, water damage can go unnoticed for longer, especially where a building isn’t used daily, which gives a failed joint time to do damage. Renewing joints in good time avoids the problem.

Pricing floor joints depends on quantities, condition and access. Ask us for a fixed quote.

What you get with us

  • One number for every site we cover
  • Public liability insurance in place
  • Work carried out by CSCS-carded applicators
  • Joints cleaned back to sound surfaces

Take a look at what affects the cost or our accreditations and insurance.

Questions about Dunton Green

Is Dunton Green off your patch?

Not at all: smaller places are covered as well as towns. We cover Greater London and the counties of the South East. Where we can, we group nearby jobs to make the most of each trip.

Is hospital work, at somewhere like Sevenoaks Hospital, something you do?

Yes. We work in healthcare settings as well as offices and schools. Before anything starts, the estates team agrees permits, inductions and infection-control measures with us.

Why is there a gap next to the joint filler?

On newer slabs, the concrete keeps shrinking after the joints are filled and a stiff filler can separate down one side. It is usually dealt with by topping up.

Do you offer coloured sealant?

In many cases, yes. Sealants are made in a wide range of standard colours, and matching to RAL references or nearby finishes is commonly requested. We will confirm the colours available for the specified product.

Will your applicators have CSCS cards?

Yes. Our applicators hold CSCS cards.

Is it fine to apply new sealant on top of old?

No. We cut the old material out and clean the joint back before sealing, since fresh sealant will not bond reliably to aged material.

What if there’s asbestos in the old mastic?

Asbestos is possible in some older mastics, particularly in buildings from before 2000. We check the asbestos register before cutting out old sealant in an older building, and if asbestos is suspected, work stops until it’s tested. Removing asbestos is a job for asbestos specialists, not us.

Honest limits

Honesty saves time and money. Fresh joints won’t solve:

  • Unstable slabs moving under traffic
  • A failing floor coating, which is a flooring contractor’s job
  • Spalled arrises, which need an edge repair first

Not sure which it is? You can give us a call on 01277 525 020 or email the details over and we will tell you honestly before you book.

Joints and surfaces we work on

  • Loading bays
  • Joints along racking aisles
  • Construction joints
  • Saw-cut induced joints
  • Forklift and pallet-truck routes
  • Retail and showroom floors

Floor joint sealing around Dunton Green: how the place shapes the job

Dunton Green has at least three named business or industrial parks inside a 3-mile radius. Sites like these are full of saw-cut floor joints, yard slabs and car park joints. Dunton Green lies roughly 18 miles out from central London. Distribution warehouses and industrial estates are common around the motorway corridors that serve the capital; their floors carry heavy traffic every shift.

Schools like Dunton Green Primary School often have long brick elevations with movement joints that age quietly. For buildings at a park such as Sevenoaks Business Centre (1.1 miles east of Dunton Green), brick and panel movement joints are easy to forget until one leaks. Phasing is what makes joint work possible on busy sites such as Goya Business Park Sevenoaks (1.1 miles east of Dunton Green): one bay, aisle or car park row at a time.

Dunton Green is about 1 mile north-west of Sevenoaks, in Kent. Commercial clients in Dunton Green use us for work on floor joints. Across Kent, 931 places are covered, Dunton Green among them. Our London page has more on work in that area, about 18 miles away.

Commercial sites across TN13 and TN14 are covered for floor joints. Buildings on Station Road, Campion Square and London Road are within our area for floor joints. We also cover Riverhead (1 mile south), Chipstead (1 mile south-west), Bessels Green (1 mile south-west), Sevenoaks (1 mile south-east) and Chevening (2 miles west) for floor joints. Nearby towns on our patch include Dartford (11 miles north), Royal Tunbridge Wells (12 miles south), Gravesend (13 miles north-east), Tonbridge (8 miles south-east), Northfleet (12 miles north-east) and Swanley (7 miles north).

What’s near Dunton Green

Locally, jobs take us to sites close to Montreal Park, The Miners Arms and Trinity School. There’s a railway station in Dunton Green itself: Dunton Green station. Well-known places in the area include Otford Heritage Centre (1.5 miles north-east) and Kemsing Castle Bank (2.8 miles east). The countryside around Dunton Green includes Dryhill Nature Reserve and Betsom's Hill.

Map of Dunton Green © OpenStreetMap contributors

For managing agents and facilities managers

CHAS accredited and a Constructionline member, we make supplier vetting simple. Our insurance certificate can be sent along with the quote.

Facilities managers want contractors who arrive with the paperwork sorted. Tell us what site paperwork you need, such as RAMS, an insurance certificate or CSCS details, and we’ll confirm with the quote.

Keeping the joints sound

After handover, these steps help:

  • Make joint checks part of your floor inspections
  • Let us know what the floor is cleaned with
  • Record damaged joints with a photo and a location
  • Keep grit out of unfilled joints in the meantime

Normal floor cleaning is fine once the product has cured. Tell us about aggressive cleaning products or hot washing at quote stage so the product suits them.

Edges tend to break slowly at first, then quickly. Once the first piece is out, wheels drop further and hit harder, so it pays to act at the first signs.

Accreditations

Trusted. Accredited. Insured.