
Facade and window perimeter sealing in Heath Common, West Sussex
Facade joint and window perimeter sealing on commercial buildings throughout Heath Common and nearby, carried out by CSCS-carded applicators. Fully insured and CHAS accredited.
- Air leaks through failed facade joints
- Staining on stone next to old sealant
- Perimeter sealant that has split or peeled away
Need facade sealing in Heath Common?
Share the site address and what’s failing, and we’ll reply with a fixed quote or arrange a visit.
Facade sealing in Heath Common
Every facade quote starts with how the joints will be reached. Tell us about access: whether scaffold is already up, what the client is arranging, and any restrictions on the site, so the price covers the real job. We work on cladding panel joints, window and door perimeters and shopfront frames, and the usual reasons a site gets in touch are perimeter sealant that has split or peeled away and previous reseals run over old sealant. Whoever orders the work in Heath Common, the brief is usually the same: a clear scope, tidy work and joints that don’t fail again.
For a site near Heath Common, the mastic visit is planned so the right sealants, primers and backing rod are on hand. Send drawings or photographs and the programme and we will quote to suit.
The 12-month guarantee covers our workmanship: the preparation, the sealing and the tooling. Damage, later alterations by others and movement beyond what the joint was designed for sit outside it.

- Where
- Heath Common (RH20)
- Region
- West Sussex
- Cover
- 12 months on every job
- Quotes
- Quoted before any work starts
- Telephone
- 01277 525 020
- Last updated
- 3 November 2026
Common problems we fix in Heath Common
Most facade joints fail through age and weathering. The bead hardens, chalks on the surface and loses the flexibility to follow the joint.
Most enquiries start with something like this:
- Facade joints cracked through the middle
- Old perimeter mastic that has dried out
- Draughts around frames and panels
- Patch repairs that keep failing
When a school such as Thakeham Primary School is extended or refurbished, the mastic package is often squeezed into the holidays.
Questions to ask before you book
- Their public liability cover
- Whether their applicators hold CSCS cards
- Do they follow the manufacturer’s priming guidance?
- How joint depth will be controlled
From enquiry to sign-off
Before we leave any area, the masking comes off, the area is cleaned and every joint is checked, ready for your sign-off. If an area should be left alone while the sealant cures, we say how long and put signs out. For work around Heath Common, we aim to finish in one visit, so we ask for photographs and rough sizes first. That way the right products come on the day.
- We look at the joints, the drawings and the access before pricing.
- Failed sealant is cut out along its full length.
- Both faces are cleaned and, where the product needs it, primed.
- Backing rod, or bond-breaker tape in shallow joints, limits the depth.
- The new sealant goes in and is tooled firmly onto both faces.
- The completed runs are checked with you, then the 12-month guarantee applies.
What we need from you
- Let us know about inductions and permits
- Tell us which areas need to stay in use
- Point out parking and an unloading spot
Request a quote
A handful of photographs and a postcode is the fastest way to a quote. Send them through the quote form, or call the office on 01277 525 020 or email a schedule or drawings if you’d rather talk the job through.
Read more
Aftercare for building managers
Every sealant joint needs some looking after, and how long they last depends on how they’re treated. We suggest:
- Walk the elevations once or twice a year
- Check the asbestos register before old mastic is disturbed
- Plan facade sealing alongside redecoration
- Check that rainwater leaves the facade the way it was designed to
If new signage, brackets or services are fixed through a sealed joint, the seal needs making good. Ask the installer to reseal it properly.
In pre-2000 buildings, check the asbestos register before old sealant is cut out. Older sealants can contain asbestos, and work stops until it’s tested if it’s suspected.
Facade sealing around Heath Common: how the place shapes the job
A number of hotels sit less than 2 miles from Heath Common. Hotel refurbishments often run to tight programmes between busy periods, and perimeter and sanitary sealant has to keep up. Rainfall across the South East, Heath Common included, is lower than in many parts of the UK. Winter mornings still bring frost and condensation on frames and panels, which is why external dates are agreed with the site manager.
Older buildings in the area around Heath Common, such as Parham House, which lies west of Heath Common, need care when sealed: the product has to suit soft or historic materials. Work at a hotel such as Mill House Hotel (1.3 miles east of Heath Common) tends to be programmed around bookings, mastic included.
Heath Common is about 1 mile east of Storrington, in West Sussex. We cover Heath Common, and jobs here get the same fixed quote and 12-month guarantee as anywhere else. Our West Sussex coverage takes in 373 places, from busy centres to rural villages. Our Brighton page has more on work in that area.
Commercial sites across RH20 are covered for facade joints. Among the streets we cover are Rock Road, Hampers Lane and Bracken Lane. Sites close to Heath Common are covered too, including Abingworth (1 mile north-west), Rock (1 mile south-east), Warminghurst (1 mile north-east), Storrington (1 mile west) and Sullington (1 mile south-west). Bigger towns within reach include Horsham (11 miles north-east), Worthing (7 miles south), Bognor Regis (15 miles south-west), Haywards Heath (15 miles east), Burgess Hill (13 miles east) and Littlehampton (9 miles south-west).
Local landmarks in Heath Common
Locally, jobs take us to sites close to Rydon Community College, among other places. For rail, the closest station is Pulborough station, roughly 4.7 miles north-west of the centre. Nearby you will also find The Storrington And District Museum (1.2 miles south-west). Open spaces near Heath Common include Chanctonbury Hill and Amberley Wildbrooks RSPB Reserve.
What the job involves on each surface
Precast concrete panels
Precast arrises sometimes crumble or carry old residue. We clean back to sound material and flag edges that need repair before sealing.
Cladding panel joints
On sealed panel systems, every joint keeps water out. Failed runs are cut out and rebuilt end to end with backing and a facade-grade sealant.
Also near Heath Common
More services for Heath Common
Common questions from Heath Common clients
Is Heath Common too small for you to travel to?
Not at all: smaller places are covered as well as towns. We work across Greater London and the South East. Send photos and a list of what needs doing, and we’ll plan the job to need as few trips as possible.
Do you cover business parks and estates near Heath Common, such as Wiston Business Park?
Yes. We cover Heath Common and the area around it, including industrial estates, business parks and retail parks such as Wiston Business Park. A few photos and the unit address let us price the work.
Do you take on small jobs?
Whatever the size, the process is the same: send details, get a fixed quote, we seal, guaranteed.
Can you just add new sealant on top?
No. New sealant won’t hold on old sealant, so the old bead is cut away and the faces are cleaned before resealing. Nothing else gives a bond that lasts.
Will rain stop the work?
Wet joints or temperatures outside the product’s range mean waiting. We plan for weather and keep you updated as the work goes on.
Are you CHAS accredited?
Yes. We are CHAS accredited, we are a Constructionline member and we use CSCS-carded applicators.
What about RAMS and site documents?
Tell us what site paperwork you need (RAMS, insurance certificate, CSCS details) and we will confirm with the quote.
What sets the cost
Before we quote, we look at:
- The size and state of each joint
- Travel to remote or island sites
- Quantities, in metres or numbers
- The product specified
Cost follows what’s involved: removing old material, preparing the joints, the product, the access and how the work is phased. Call for a quote and we will explain how it’s made up.
Details that help us quote
We can often quote from photos and a few details. Please tell us:
- Photos of the joints, close up and from further back
- The product your specification calls for
- Any dates the work must fit around
- Where the site is, with the postcode
Photos, drawings or a schedule of the joints are often enough for a fixed quote. Where a site visit makes more sense, we will arrange one.
When it isn’t the sealant
Before quoting, we check that sealant is the right answer. It won’t put right:
- Joints whose design needs changing by the specifier
- Specialist high-level access methods
- Replacing glass or failed glazing units
Not sure which it is? You can give us a call on 01277 525 020 or use the quote form and we’ll tell you honestly.
Surfaces we seal
- Perimeter joints where frames meet the structure
- Coping and flashing joints
- Window and door perimeters
- Cladding panel joints
- Stone and brick facade joints
- Shopfront frames