Expansion and movement joint sealing in Strood, Medway
Expansion and movement joint sealing in walls, decks and floors in Strood. CHAS accredited, Constructionline member, with a 12-month guarantee on workmanship.
- Sealant peeling off one face of the joint
- Damp inside where a wall movement joint has failed
- Debris jammed in movement joints
Expansion joint sealing in Strood
Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.
Expansion joint sealing in Strood
Few joints take as much punishment as those in a car park. Wheel loads, grit and de-icing salts attack the seal and the concrete either side; water dripping through to the deck below is often the first sign. A sealant suited to traffic and the expected movement goes in, phasing bays so the car park can stay in use. If you have chipped joint edges on forklift routes and debris jammed in movement joints, we can put it right. Whoever orders the work in Strood, the brief is usually the same: a clear scope, tidy work and joints that don’t fail again.
Movement joints on schools, offices and shops in towns like Strood are easy to overlook until water gets in. Once the sealant hardens or splits, water gets into the wall and the joint no longer works.
Our workmanship is guaranteed for 12 months. If our installation lets you down in that time, we return and fix it.
- Place
- Strood (ME2, ME1, ME3)
- Wider area
- Medway
- Cover
- A 12-month guarantee
- Price
- A fixed quote before we start
- Telephone
- 01277 525 020
- Updated
- 3 November 2026

Floors, slabs and movement joints in Strood
Rainfall across the South East, Strood included, is lower than in many parts of the UK. External slab and deck joints still need a dry, clean joint to seal, and winter de-icing salt on car parks and ramps works into any open joint. At about 26 miles from central London, Strood is within reach of the capital. Distribution warehouses and industrial estates are common around the motorway corridors that serve the capital, and their floor joints take forklift and pallet-truck traffic all day.
For estates staff at a university like University for the Creative Arts - Rochester, 1.8 miles south-east of Strood, building and paving joints are part of the planned maintenance list. Schools such as Elaine Primary School have movement joints in their walls and floors that are easy to overlook.
Strood is about 3 miles north-west of Chatham, in Medway. Businesses, contractors and managing agents in Strood use us for work on movement joints, as part of our coverage of Medway. Across Medway, 54 places are covered, Strood among them. London is covered too, around 26 miles from Strood.
Work on movement joints is covered throughout ME2, ME1 and ME3, whatever the building. For a building on Ash Road, Gun Lane and Pine Road or nearby, send details and we will quote for movement joints. Strood sits on or close to the A2 and A226, useful when we plan access and materials. If your building is just outside Strood, we cover Rochester (1 mile east), Borstal (1 mile south), Cuxton (2 miles south-west), Lower Bush (2 miles south-west) and Upper Bush (2 miles south-west). Nearby towns on our patch include Gillingham (4 miles east), Chatham (3 miles south-east), Rainham (6 miles east), Luton (3 miles south-east), Park Wood (6 miles south-east) and Lordswood (5 miles south-east). As one of the bigger centres in Medway, Strood has a broad mix of commercial, public and industrial buildings, and we cover them all.
What’s near Strood
Locally, jobs take us to sites close to Rede Common, Temple School and Strood Academy, among other places. The closest station to Strood is Strood station, about 1 mile east of the centre. Nearby you will also find Rochester Castle (1 mile east) and Six Poor Travellers House (1.2 miles east). The countryside around Strood includes Rede Common and Gad's Hill.
Also near Strood
Also in Strood
What we’re called out for in Strood
Sun, rain and frost age external movement joints. UV hardens the surface, and the sealant loses its ability to stretch, so it can’t follow the movement any more.
Clients typically get in touch after noticing something like this:
- Torn sealant in brick or block movement joints
- Debris jammed in movement joints
- Sealant peeling off one face of the joint
- Previous reseals laid over old sealant
Another example is Strood Retail Park, 0.7 miles east of Strood, where floors and yards would be done in stages around the occupiers.
Before you book anyone
- How they handle RAMS and site documents
- Whether primer will be used where the manufacturer specifies it
- Is the sealant right for the movement and the substrate?
- The terms of the workmanship guarantee
Strood: questions and answers
Does your area include sites such as Gun Lane Business Centre, near Strood?
Yes. Our area takes in Strood and its surroundings, with estates and business parks such as Gun Lane Business Centre included. A few photographs and the unit address let us price the work.
Must our site in Strood stop work while the joints are done?
In the majority of cases the site keeps working. Joints are done in phases, a bay, aisle or deck at a time. Tell us which hours and entrances we can use and we’ll plan from there.
What’s the quickest route to a quote?
There are four steps: send details, get a quote, we seal, guaranteed. The first step only needs photos and a postcode.
Do you seal on top of existing sealant?
No. We cut the old material out and clean the joint back before sealing, because fresh silicone will not bond with aged silicone.
How long does movement joint sealing take?
The metres of joint, the access and the amount of removal decide it. Typically it takes a short visit for a handful of joints, or several days or more for a car park deck or long runs of facade joints.
Can you follow the specification on our project?
Yes. We follow the specification, along with the manufacturer’s installation guidance, and any queries are raised before we start.
Can you seal car park deck joints?
Yes. Deck and ramp joints are resealed with a trafficable sealant chosen for the movement with bays phased so the car park keeps operating.
Our process
When we get to site, we sign in, go through any site induction and check how permits are handled. Floors, finishes and fittings next to the joints are covered before any cutting starts, with the work itself normally taking a few hours to several weeks, depending on how many metres of joint there are and how much old sealant or filler needs removing. For a town like Strood, we try to group jobs for the same client into one visit. Tell us when the building is open and we’ll plan to suit.
- We assess the joints on site or from photographs, noting widths and how each has failed.
- You receive a fixed quote stating the product and the movement it is rated for.
- Where areas have to stay open, we agree a phased sequence before starting.
- The failed seal is cut out and both joint faces cleaned back to sound material.
- Depth is controlled with backing, the faces are primed where the maker calls for it, then the bead is laid and tooled.
- Finished joints are inspected, the cure time confirmed and the 12-month guarantee applies.
Before we start on site
- Send your site hours and access windows
- Tell staff and tenants when we’ll be in
- Confirm the product named in the specification
Request a quote
Quotes are fixed against the scope you send, so the cost is agreed before work starts. To ask for one, ring 01277 525 020 or use the quote form.
Related advice
Site staff or a sealant specialist?
There’s also the paperwork. Main contractors and clients often ask for CSCS cards, RAMS and insurance details, and our CSCS-carded applicators are used to working under those rules.
What you see is the finished bead, but most of the work is hidden. Backing rod, primer where specified and a joint designed to move with the building are where general trades tend to cut corners.
When it isn’t the sealant
A few problems need another trade or a different fix, and we say so rather than covering them up:
- Failed waterproofing membranes on podiums, roofs or decks (a waterproofing specialist’s job)
- Damaged metal nosings or cover plates over a joint
- Crumbling edges that would give a new bead nothing sound to grip
If in doubt, phone 01277 525 020 or send photos by email and we’ll say what we think.
Where we work in Strood
- Blockwork control joints
- Podiums and floor movement joints
- Car park decks and ramps
- Cladding panel joints
- Precast concrete panel joints
- Brickwork movement joints
What affects the price in Strood
Before we quote, we look at:
- Whether the work must be split into stages
- Any access equipment needed
- Joint width, depth and condition
- Quantities, in metres or numbers
The specified product makes a difference, and so does the preparation, from cutting out to priming and backing rod. Access, phasing and site requirements come into it too.
What to include in your enquiry
A few photos plus some basic facts will normally do. It helps to include:
- Drawings or a marked-up plan, if available
- When you need the work done
- Access details, including height
- What the building is and how it’s used
A good quote starts with a clear picture: the joints involved, quantities, access and the product called for. Share whatever details you have and we’ll fill any gaps with a visit.
Building owners, agents and FMs in Strood
Housing associations and managing agents often need work done across blocks and communal areas. Work can be phased so residents and staff keep access throughout, with each stage agreed with your site contact.
CHAS accredited and a Constructionline member, we make supplier vetting simple. Our insurance certificate can be sent along with the quote.