
Expansion and movement joint sealing in Broomer's Corner, West Sussex
Expansion joint sealing in Broomer's Corner, backed by over 20 years in commercial sealing. Fully insured and CHAS accredited.
- Hardened, cracked sealant on exposed facades
- Damp inside where a wall movement joint has failed
- Torn sealant in brick or block movement joints
Expansion joint sealing for Broomer's Corner sites
Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.
About our expansion joint sealing in Broomer's Corner
Joints in car park decks and ramps are among the hardest-working in any building. Wheel loads, grit and de-icing salts attack the seal and the concrete either side. A sealant suited to traffic and the expected movement goes in. Site teams most often ask us about debris jammed in movement joints and car park joints leaking onto vehicles below, across car park decks and ramps, cladding panel joints and podiums and floor movement joints. Searching for sealant specialists in Broomer's Corner? Mastic Doctor has worked for contractors, FMs and building owners since 2005, CHAS accredited and a Constructionline member.
Jobs around smaller places like Broomer's Corner are planned so the whole job is done in one visit, with the right materials on hand. Note joint widths and the traffic that uses them, and we will take it from there.
Building owners and contractors get the same cover: a 12-month guarantee on our workmanship. It doesn’t extend to damage, faults in the building or work by others, and we’re upfront about that.
- Location
- Broomer's Corner (RH13)
- Region
- West Sussex
- Cover
- 12 months on every job
- Price
- Fixed quote, scope in writing
- Call
- 01277 525 020
- Page updated
- 3 November 2026

Why it’s worth doing now in Broomer's Corner
A torn seal left alone usually gets worse. Water and debris get in, the joint jams and the edges spall. Acting at the first split keeps the cost down. Halls, stores and units around places like Broomer's Corner may not be checked every day, so a failed joint can leak for a while before anyone sees it. Resealing early avoids that.
What a job costs comes down to the quantity of joints, what has to come out first and the access. Call for a fixed quote once you have the details.
Why clients in Broomer's Corner choose us
- Joints cleaned back to sound surfaces
- Colour agreed before work starts
- CHAS accredited
- One phone line for London, the South East and Scotland
See how commercial sealant jobs are priced and our accreditations and insurance.
Surface by surface
Brickwork and blockwork joints
Vertical movement joints in brick and block walls let the masonry grow and shrink. We use a sealant rated for the movement, normally low-modulus.
Podium joints
Podiums take foot traffic, planters and weather. We choose a product that copes with feet, wheels and weather.
Should maintenance staff do it?
Putting right a botched joint often costs more than sealing it well at the start, since all of it has to come out and the faces be cleaned back again. That’s why many clients bring in a specialist from the beginning.
For a quick touch-up, site staff may be fine, but anything bigger is another matter: a specialist brings efficiency, a consistent finish and a 12-month guarantee.
Signs you need expansion joint sealing in Broomer's Corner
Repeated failure often traces back to the wrong product. Products not classed for the movement fail early. BS EN ISO 11600 classifies building sealants by movement capability, and specifications often refer to it.
These are often picked up first by site or facilities staff:
- Chipped joint edges on forklift routes
- Damp inside where a wall movement joint has failed
- Torn sealant in brick or block movement joints
- Layers of sealant in a movement joint
Schools such as William Penn School have movement joints in their walls and floors that are easy to overlook.
What to look for in a quote
- Whether old or failed sealant will be cut out, not overlaid
- Their public liability cover
- Their plan for phasing and protecting the area
- Their pre-qualification and accreditations
Where floor joints take the most wear near Broomer's Corner
Broomer's Corner is about 38 miles from central London. Distribution warehouses and industrial estates are common around the motorway corridors that serve the capital; their floors carry heavy traffic every shift. The South East is one of the drier parts of the UK. External joints still wait for dry conditions, and winter de-icing salt on car parks and ramps works into any open joint.
Phasing is what makes joint work possible on busy sites such as Pondtail Farm (Business Park) (2.6 miles north-east of Broomer's Corner): one bay, aisle or car park row at a time. Business parks such as Crays Court (business park), 2 miles south of Broomer's Corner, have car parks, paved areas and long brick and panel elevations, all with movement joints.
Broomer's Corner is about 7 miles south-west of Horsham, in West Sussex. Any commercial site in Broomer's Corner is covered. Our West Sussex coverage takes in 373 places, large and small. For work in that direction, see our Brighton page (15 miles or so).
Postcode districts covered here: RH13. We cover commercial and managed buildings on Saucelands Lane, Sincox Lane and Hooklands Lane and the roads nearby. If your building is just outside Broomer's Corner, we cover Whitehall (1 mile east), Shipley (1 mile north-east), Dragons Green (2 miles north-east), Dial Post (2 miles south-east) and Ashington (3 miles south). Further afield, our area takes in Crawley (13 miles north-east), Horsham (7 miles north-east), Worthing (11 miles south), Haywards Heath (13 miles east), Burgess Hill (12 miles east) and Littlehampton (13 miles south-west).
Landmarks near Broomer's Corner
The closest station to Broomer's Corner is Billingshurst station, roughly 3.4 miles north-west of the centre. Open spaces near Broomer's Corner include Knepp Wildland.
Questions we are asked in Broomer's Corner
Is Broomer's Corner off your patch?
Not at all. Broomer's Corner is within our area. Our area covers London and the South East counties. We plan jobs in smaller places so return trips are kept to a minimum.
Can you work at a site such as Crays Court (business park), by Broomer's Corner?
Yes. We cover Broomer's Corner and the area around it, including industrial estates, business parks and retail parks such as Crays Court (business park). To start, just give us a call on 01277 525 020 or email a schedule or drawings with the unit, the joints involved and your access times.
Are you fully insured?
Yes. We are fully insured, including public liability cover.
Why has the sealant in our expansion joints split?
Normally the joint is moving more than the sealant can take. That’s why we check width, depth and movement class before quoting so the same failure isn’t repeated.
How long will the joint resealing take?
Allow anything from part of a day to a couple of weeks, depending on joint lengths, widths and access. Timings are set out in the quote.
Is any job too small?
Whatever the size, the process is the same: details, then a fixed price, then sealing, then a 12-month guarantee.
What do you charge?
We don’t publish prices, as every site differs. With photographs or drawings, we can give you a fixed quote.
Nearby places to Broomer's Corner
What else we do in Broomer's Corner
On site: what to expect
The first thing on site is a walk round with your contact, agreeing which joints are in scope, where to start and what must stay open. After that, any old or failed material is removed, each joint is prepared and the new sealant goes in. Smaller jobs around Broomer's Corner can be grouped with others nearby. You will have a fixed quote before work starts.
- We assess the joints on site or from photos, noting widths and how each has failed.
- A fixed quote names the sealant we propose and its movement class.
- Phasing is agreed so decks, floors or entrances can stay in use where needed.
- We strip the old sealant or filler and prepare each face until it’s sound and dry.
- Backing rod or bond-breaker sets the depth, primer goes on where specified, and the sealant is applied and tooled.
- Finished joints are inspected, the cure time confirmed and the 12-month guarantee applies.
Before we start on site
- Confirm the product named in the specification
- Tell us what induction or permit system the site runs
- Clear stock, furniture or equipment away from the joints
Quotes
Need a figure for a tender or a budget? Send the scope and any drawings, and we’ll return a fixed quote that you can work with. If you have questions first, give us a call on 01277 525 020 or use the quote form.
Advice
Aftercare for building managers
After handover, a little attention goes a long way:
- Treat a small split as a warning, not a cosmetic issue
- Brief car park operatives to protect joint lines during winter clearance
- Keep traffic off new joints until the cure time is up
- Keep product details with the building records for the next reseal
Keep wheels, feet and water off new joints until the sealant has cured. The time varies with product, conditions and joint depth. Keeping the area coned off until then avoids tyre marks and damage.
On a multi-storey car park, a failed joint normally shows up as a leak onto the deck underneath. That water often carries de-icing salts with it. Resealing early limits the damage.