The Mastic Doctor team standing beside their branded vans outside an office building
Greater London · England

Mastic Sealing in Silvertown

Mastic sealing for building owners, managing agents and housing associations in Silvertown. CHAS accredited and fully insured, with a 12-month guarantee.

  • Old repairs sealed over failed mastic
  • Draughts at frames across a block
  • Complaints coming in block by block
1
Send details
Photos, drawings or a schedule, or we visit.
2
Get a quote
A fixed quote for the work, with the scope in writing.
3
We seal
The right sealant, to the right depth, neatly finished.
4
Guaranteed
Signed off, with 12 months’ guarantee.
Covering the South East & Scotland
CHAS & Constructionline
£5m PL insurance

Mastic sealing for businesses in Silvertown

Photos, a specification or a quick description of the joints is enough to start a fixed quote.

Mastic sealing for commercial buildings in Silvertown

There isn’t one mastic for every joint on a building. Low-modulus neutral-cure silicone suits many window perimeters and external movement joints, and MS polymer sealants stick well to many substrates and often take paint. We’ll confirm the colours available for the specified product. If you are dealing with repeated reactive repairs to the same buildings and leaks at window and door perimeters, we can put it right, whatever the surface. Facilities teams, main contractors and managing agents in Silvertown tend to want the same three things: a clear scope, tidy work and joints that don’t fail again.

London has a large stock of purpose-built blocks, mansion flats and converted buildings managed by agents and housing associations. Mastic around windows, doors and balconies tends to fail across a whole block at a similar time.

Every job is signed off with a 12-month guarantee. The promise is simple: if our work fails within that year, we put it right.

Where
Silvertown (E16, SE10, SE7)
Region
Greater London
Guarantee
12 months on our workmanship
Quotes
A fixed quote before we start
Telephone
01277 525 020
Last updated
3 November 2026
The Mastic Doctor team beside their liveried vans in front of an office building

What the job involves on each surface

Tenement and older buildings

Some old mastics in pre-2000 buildings contain asbestos, so we check the asbestos register or survey first. If it’s suspected, work stops until it’s tested.

Planned maintenance

Adding mastic to planned maintenance avoids reactive repairs and keeps budgets predictable.

Silvertown: questions and answers

Will you take on a block within reach of Custom House station?

Yes, we work for agents, landlords and housing associations with blocks of every size. We work to your notice and access arrangements.

Can you work in a care home near Silvertown with residents in?

Yes, with the manager deciding the order and timing of rooms. Any site rules, from signing in to infection control, are agreed before we start.

Is mastic sealing guaranteed?

There is a 12-month guarantee on our workmanship, backed by public liability insurance.

How long before the joints can be used?

Curing time varies by product, and we confirm it on the day.

Can you work to our specification?

Yes. Send it with your enquiry, and we will price the work to it.

Will you just go over the old sealant?

No. We cut the old material out and clean the joint back before sealing, since fresh sealant will not bond reliably to aged material.

Is Silvertown in your area?

Yes. We cover Silvertown and the rest of Greater London. To discuss a job, call the office on 01277 525 020 or email the details over.

Looking after buildings in and around Silvertown

Blocks in London are usually run by managing agents, landlords or housing associations, with residents to notify and access to arrange. We work to your notice and access plan. Five care or nursing homes sit less than 2 miles from Silvertown. Frame mastic on care buildings is best renewed elevation by elevation, with the manager deciding timings.

Blocks of flats and mixed-use buildings often cluster around stations such as Custom House station, 0.7 miles north of Silvertown, and their window and balcony mastic tends to age at the same rate across a building. Student blocks close to universities like Ravensbourne University London, 1.1 miles west of Silvertown, are easiest to work on between tenancies. Property owners at sites such as Greenshields Industrial Estate (to the west of Silvertown) can have mastic renewed between lettings.

Silvertown is about 1 mile south of Canning Town, in Greater London. Businesses, contractors and managing agents in Silvertown can call on us for mastic joints, as part of our coverage of Greater London. Across Greater London, 764 places are covered, Silvertown among them.

Business premises anywhere in E16, SE10 and SE7 are within our area for mastic joints. Buildings on Booth Road, Thames Road and Knights Road are within our area. Just outside Silvertown, we also work in West Silvertown (1 mile north-west), Custom House (1 mile north), Royal Docks (1 mile north-east), Canning Town (1 mile north) and Limmo Peninsula (1 mile north-west). Further afield, our area takes in London (5 miles west), City of Westminster (8 miles west), Marylebone (8 miles west), Kensington (10 miles west), St Pancras (7 miles west) and Shoreditch (5 miles west).

Near you in Silvertown

In Silvertown, that means premises near Anchor & Hope pub, Thames Barrier Park and The Royal Docks Community School, among other places. The closest station to Silvertown is Custom House station, roughly 0.7 miles north of the centre. A little further out are Charlton Athletic Museum (1 mile south) and Gallions Reach Shopping Park (2.3 miles east). The countryside around Silvertown includes Tower Hill and Gilbert's Pit.

Map of Silvertown © OpenStreetMap contributors

Cost factors for mastic joints

Each job is priced on its own details. The main factors are:

  • How much existing material needs removing
  • Specialist products, such as fire-rated or hygienic sealants
  • How accessible the joints are
  • Phasing around occupants

What a job costs comes down to the quantity of joints, what has to come out first and the access. Call for a fixed quote once you have the details.

What to include in your enquiry

It doesn’t need to be a full survey. These details are enough to start:

  • Rough lengths or quantities, or drawings if you have them
  • What the building is and how it’s used
  • Specification clauses that apply
  • Whether an asbestos survey exists

A good quote starts with a clear picture: the joints involved, quantities, access and the product called for. Send what you have, and we’ll arrange a site visit if anything is unclear.

Why act early in Silvertown

Leaving failed external joints lets water reach the structure behind. That can lead to damp, staining and damage to finishes and those cost far more to put right. Access in London is hard enough to arrange once, so it makes sense to deal with every failing joint while access is in place.

A quote for mastic joints depends on quantities, condition and access. Call for a quote.

Why us?

  • Standard and matched colours in many product ranges
  • Sealing commercial buildings since 2005
  • One phone line for London, the South East and Scotland
  • Colours confirmed for the specified product

See what affects the cost or our accreditations.

Diagnose, treat, sign off

We schedule the visit to fit the site hours and access windows you give us. While we’re working, the area stays contained and tidy, and your contact hears from us before we move to the next area. For a job in Silvertown, access comes first. Give us the hours we can be on site and we will schedule to suit.

  1. First comes a look at the joints and, for older buildings, the asbestos records.
  2. A fixed quote covers the joints, products and order of work.
  3. We strip out the old sealant.
  4. The joints are prepared and resealed with the right product.
  5. We finish each building before moving to the next.

Getting the site ready

  • For older buildings, check the asbestos register before work
  • Tell us your opening times and when work is allowed
  • Flag any permit to work we’ll need

Get a fixed quote

Quotes are fixed against the scope you send, so the cost is agreed before work starts. To ask for one, speak to us on 01277 525 020 or email drawings and photos.

Get a quick quote

Related advice

Aftercare for building managers

Sealant joints are maintenance items, and how long they last depends on how they’re treated. Our advice:

  • Look at the sunniest and most exposed elevations first
  • Encourage occupiers to report problems at frames
  • Make mastic part of routine maintenance checks
  • Keep bins and bikes away from communal door frames

Add mastic joints to your cyclical inspections. Watch for splits, open gaps, hard or chalky surfaces and mastic pulling away and record where they are.

Left open, joint edges in render, brick or frames can deteriorate. Then the edges may need repairing first.

When to bring in a specialist

Redoing a failed joint usually costs more than getting it right at the outset, because the whole bead must be removed and the faces cleaned back again. That’s why many clients bring in a specialist from the beginning.

There’s also the paperwork. Many sites expect CSCS cards, RAMS and proof of insurance, and we will confirm the paperwork you need with the quote.

Accreditations

Trusted. Accredited. Insured.