
Facade Sealing contractors in Shippon
Work needed on a facade joint in Shippon? We look at it, seal it with the right product and hand it over with a 12-month guarantee.
- Gaps between rainscreen or cladding panels
- Water coming in around window frames
- Air leaks through failed facade joints
Facade sealing for Shippon sites
Tell us what needs sealing and where, with photos or drawings if you have them, and we’ll price it.
When to call us in Shippon
Not every failure is in the sealant: crumbling render, spalling concrete or flaking paint take the sealant with them. When the joint edges need repair first, we say so.
Common reasons buildings call us in:
- Unsightly perimeter sealant on a visible elevation
- Patch repairs that keep failing
- Hard, chalky sealant that no longer flexes
- Cold air coming in at window perimeters
School extensions, at buildings such as Larkmead School, usually run to the summer holidays, mastic included.
Comparing quotes
- How they handle RAMS and site documents
- How they’ll work around occupants
- Is the sealant right for the movement and the substrate?
- Proof of insurance
About our facade sealing in Shippon
Every facade quote starts with how the joints will be reached. Let us know what access exists or is planned, and any site rules we need to work around, and we’ll fit the work around it. If you’re dealing with discoloured or dirty facade joints and weathered facade joints that have lost their grip, we can help. Whoever orders the work in Shippon, the brief is typically the same: a clear scope, tidy work and joints that don’t fail again.
In the countryside around places like Shippon, conversion schemes put new frames into old stone, flint, brick or timber. A product that grips an irregular face, with a colour that suits the building’s character, is normally what’s needed.
We stand by our work with a 12-month guarantee. That covers our preparation and application, and we come back if anything isn’t right.
- Location
- Shippon (OX13)
- Wider area
- Oxfordshire
- Guarantee
- 12 months on every job
- Quotes
- Fixed quote, scope in writing
- Phone
- 01277 525 020
- Page updated
- 3 November 2026

Shippon: questions and answers
Can work at a site such as McTimoney Chiropratic College fit around teaching?
Yes. Tell us the term dates, vacation periods and access windows, and we’ll plan the work around them. Let us know which documents your site asks for, and we will confirm them alongside the quote.
Is Shippon too far out for you?
Not at all. Shippon is within our area. We cover Greater London and the counties of the South East. Where we can, we group nearby jobs to make the most of each trip.
Is it fine to apply new sealant on top of old?
No, never. Overlaying old sealant is a frequent cause of early failure, so everything comes out first.
How long do sealant joints last?
There isn’t a single answer, since movement, weather, cleaning and use all affect it. Regular checks let you plan resealing before leaks or damage.
When can the area be used after sealing?
The product and site conditions decide that. Some take light use quickly, others need longer to cure, so we will confirm the curing time on the day.
Are your applicators CSCS-carded?
Yes. Should the site need card details in advance, let us know and we’ll send them with the quote.
Can you work while the building is occupied?
Normally, yes. We phase the work so most of the building stays in use, with each area protected and signed.
What we can’t put right
Honesty saves time and money. New sealant won’t cure:
- Providing access systems for the work
- Cracked or spalling substrates that need repair before sealing
- Installing or repairing glazing systems
Not sure which it is? You can give us a call on 01277 525 020 or use the quote form and we’ll tell you honestly before you book.
Where we work in Shippon
- Perimeter joints where frames meet the structure
- Coping and flashing joints
- Shopfront frames
- Stone and brick facade joints
- Window and door perimeters
- Cladding panel joints
Work for main contractors and building owners
FMs need a contractor who is easy to get on site. Tell us what site paperwork you need, such as RAMS, an insurance certificate or CSCS details, and we will confirm with the quote.
Housing associations and managing agents often need work done across blocks and communal areas. Work can be phased so residents and staff keep access throughout, with each stage agreed with your site contact.
Facade sealing in Shippon: the local picture
At about 53 miles from central London, Shippon is within reach of the capital. Towns within reach of London tend to keep building, from flats to offices and schools, which keeps mastic packages in demand. The South East is one of the drier parts of the UK. Winter mornings still bring frost and condensation on frames and panels, so external mastic is timed for workable conditions and agreed with the site manager.
On a healthcare site such as Abingdon Community Hospital, which lies south of Shippon, new blocks and refurbishments go on while the hospital keeps running, so mastic work is sequenced carefully. For contractors refurbishing units at places like Abingdon Business Park, which lies south of Shippon, the mastic covers cladding panels, roller-door and window perimeters.
Shippon is about 1 mile west of Abingdon-on-Thames, in Oxfordshire. Commercial clients in Shippon can call on us for facade joints. 423 places across Oxfordshire fall within our area, Shippon among them. Oxford is covered too, some 6 miles away.
Commercial sites across OX13 are covered for facade joints. Buildings on Chestnut Tree Close, Willow Tree Close and Whitehouse Close are within our area. Nearby places we also cover include Cothill (1 mile north-west), Dry Sandford (2 miles north-west), Marcham (2 miles south-west), Sutton Wick (2 miles south) and Frilford Heath (2 miles west). A short drive away, we cover Oxford (6 miles north-east), Didcot (6 miles south-east), Witney (11 miles north-west), Carterton (14 miles north-west), Thame (15 miles east) and Wantage (8 miles south-west).
Near you in Shippon
Recent enquiries here include premises near St Nicolas Church of England Primary School, Prince Of Wales pub and Albert Park. The closest station to Shippon is Radley station, about 2.8 miles east of the centre. Well-known places in the area include Abingdon Community Hospital (0.8 miles south) and FitzHarris Castle (1 mile south-east). For a walk, there’s Cumnor Hill and Dry Sandford Pit.
Our process
Diagnose, treat, sign off: every visit follows that pattern. We inspect the joints and confirm what’s in scope, then we prepare and seal each joint with the specified product, and we finish with a walk round so the work can be signed off. For work around Shippon, we aim to finish in one visit, so we ask for photographs and rough sizes first. Then the right materials arrive with us.
- We look at the joints, the drawings and the access before pricing.
- Failed sealant is cut out along its full length.
- Both faces are cleaned and, where the product needs it, primed.
- Closed-cell rod fixes the depth, and the sealant grips two sides only.
- A facade-grade sealant rated for the movement goes in, tooled to a concave profile.
- We walk the finished joints with you before handing over.
What we need from you
- Agree which areas must stay open
- Move anything stored against the joints
- Confirm the product named in the specification
Request a quote
Need a figure for a tender or a budget? Send the scope and any drawings, and we’ll return a fixed quote you can plan around. If you have questions first, call the office on 01277 525 020 or send photos by email.
Advice
After the work
Problems stay small when the joints are checked regularly. In particular:
- Report water ingress at frames as soon as it shows
- Note when each elevation was last resealed
- Check the asbestos register before old mastic is disturbed
- Insist on a full cut-out when joints are renewed
Record the sealant type and date on the building file. It helps when matching repairs or planning the next reseal.
Don’t wait for a full elevation to fail. Small repairs stop small leaks becoming large ones inside the building.
Why deal with it now?
If access is already up for other work, resealing at the same time makes sense. Combine it with planned external works and you only arrange access once, which is often the biggest saving. One visit to deal with every failing joint makes more sense than several trips to a place like Shippon. Photos of every joint help us quote for the whole job.
Access often affects the price as much as the sealing: easy-to-reach joints are quicker than those that need equipment to get to. Tell us how the joints are reached and call for a quote.
What you get with us
- Public liability insurance in place
- Commercial sealant work since 2005
- Failed material removed, not covered up
- Health and safety: CHAS accredited
See our cost guide and our accreditations.