The Mastic Doctor team standing beside their branded vans outside an office building
Hampshire · England

Expansion and movement joint sealing in Foulford, Hampshire

We carry out expansion and movement joint sealing in walls, decks and floors in Foulford. Send photographs or drawings for a fixed quote.

  • Sealant peeling off one face of the joint
  • Chipped joint edges on forklift routes
  • New sealant over old, now failing
1
Send details
Photos, drawings or a schedule, or we visit.
2
Get a quote
A fixed quote for the work, with the scope in writing.
3
We seal
Prepared joints, the specified product, a tidy finish.
4
Guaranteed
Backed by a 12-month workmanship guarantee.
Covering the South East & Scotland
Constructionline member
£5m public liability

Need expansion joint sealing in Foulford?

Share the site address and what’s failing, and we’ll reply with a fixed quote or arrange a visit.

For managing agents and facilities managers

If you look after buildings for someone else, you need clear quotes and clear reporting. We quote a fixed sum, confirm the scope and walk the finished work with you or your representative.

Planned maintenance programmes are welcome: resealing failed joints building by building, on a schedule that suits your budget. Sites in Foulford can sit alongside others in a wider programme.

About our expansion joint sealing in Foulford

Long runs of brick or block have movement joints built in. Once the seal fails, rain reaches the cavity and the joint can no longer close. The old seal is cut away, backing rod goes in at depth, and a low-modulus masonry sealant is gunned and tooled, primed where the manufacturer specifies. If you have water getting into the wall through a failed joint and debris jammed in movement joints, we can put it right, on brickwork movement joints, precast concrete panel joints and blockwork control joints alike. Most enquiries from Foulford start with one failed joint and grow into a wider look at the building: we look at the rest while we are there and tell you what we find.

Smaller community and commercial buildings around Foulford have their own movement joints in walls and floors. They’re easily forgotten until water gets in or an edge breaks.

We sign every job off with a 12-month guarantee. It’s a plain promise: if the work we did fails within twelve months, we return to fix it.

Location
Foulford (BH24)
Wider area
Hampshire
Cover
12 months on every job
Price
A fixed quote before we start
Call
01277 525 020
Last updated
3 November 2026
Mastic Doctor team members lined up next to their branded vans outside an office building

Common questions from Foulford clients

Is Foulford too far out for you?

No. Places such as Foulford are covered as much as the big towns. Our area covers London and the South East counties. Good photos up front let us bring everything on the first visit.

Do you cover business parks and estates near Foulford, such as Platinum Jubilee Business Park?

Yes. We cover Foulford and the area around it, including industrial estates, business parks and retail parks such as Platinum Jubilee Business Park. Send details of the unit and the work through our quote form for a quick quote.

Can you seal joints in cold or wet weather?

The joint has to be dry, and the air and surface temperature inside the product’s limits. Frost, rain and condensation on steel or concrete can hold up external work.

What exactly is a movement joint?

Put simply, it’s a planned break in a wall, slab or deck so the materials can move. Many people call it an expansion joint and both need a flexible seal.

What if the joint edges are damaged?

A bond is only as strong as the material behind it, so broken or crumbling edges have to be repaired first. Where it’s visible beforehand, we’ll say so when we quote.

Can you work on car park ramps and decks?

Yes. Deck and ramp joints are resealed with a trafficable sealant chosen for the movement.

How long does movement joint sealing take?

That depends on joint lengths, widths, access and how much old sealant or filler needs removing. As a guide, it usually takes a short visit for a handful of joints, or several days or more for a car park deck or long runs of facade joints.

Keeping the joints sound

Problems stay small when the joints are checked regularly. In particular:

  • Raise snow-clearing blades over deck joints where possible
  • Keep traffic off new joints until the cure time is up
  • Inspect movement joints alongside other routine building checks
  • Record the sealant used and the date in the O&M file

Every joint we seal is backed by a 12-month guarantee on workmanship. Record which product went into which joints in the building file so future maintenance isn’t guesswork.

An open joint fills with grit, and a joint full of grit can’t close. The edges then take the pressure and start to spall. Keeping the seal sound avoids all of that.

What sets the cost

Quotes vary with the job. Expect it to depend on:

  • Specialist products, such as fire-rated or hygienic sealants
  • Joint width, depth and condition
  • Working within restricted access windows
  • Quantities, in metres or numbers

Access often affects the price as much as the sealing: easy-to-reach joints are quicker than those that need equipment to get to. Tell us how the joints are reached and call for a quote.

Details that help us quote

A good diagnosis starts with the right details. Let us know:

  • Whether the building will be occupied during the work
  • Any dates the work must fit around
  • The postcode of the building
  • The asbestos register, for older buildings

Send details, get a quote, we seal, guaranteed: that’s how every job runs. To take the first step, call 01277 525 020 or email us.

Honest limits

Being straight saves everyone time. New sealant won’t cure:

  • Proprietary pre-formed expansion joint systems
  • Failed waterproofing membranes on podiums, roofs or decks (a waterproofing specialist’s job)
  • Cracking or settlement that calls for an engineer’s assessment

If you’re not sure, just give us a call on 01277 525 020 or send photos by email and we will give you a straight answer before you book.

What we seal

  • Brickwork movement joints
  • Precast concrete panel joints
  • Car park decks and ramps
  • Podiums and floor movement joints
  • Cladding panel joints
  • Blockwork control joints

On site: what to expect

Before we leave any area, the masking comes off, the area is cleaned and every joint is checked, ready for your sign-off. Where the sealant needs time to cure before use, we tell you and sign the area. For a building around Foulford, tell us how to find it and who will meet us. Send that with the details and we’ll confirm the plan with the quote.

  1. We start with photos, approximate lengths and any drawings, visiting where needed.
  2. Joint widths and expected movement are checked against what the sealant can take and tell you if the design looks wrong for the movement.
  3. Old sealant and debris are cut out of every joint.
  4. Any broken arrises or friable edges are flagged before work goes further.
  5. A sealant suited to the movement and traffic is laid to depth and tooled.
  6. Each area is handed back after its cure time, under our 12-month guarantee.

What we need from you

  • Let us know about inductions and permits
  • Send any specification or drawings in advance
  • Let building users know which areas are affected

Get a fixed quote

Let us know the site, the scope and your timescale, and we will put a fixed quote together. The easiest way is to give us a call on 01277 525 020 or send photos by email.

Get a price

Read more

Slabs, ramps and loading bays in Foulford

The South East is one of the drier parts of the UK. Even so, yard and car park joints are only sealed when they’re dry and clean, and winter de-icing salt on car parks and ramps works into any open joint. Foulford has at least three named business or industrial parks inside a 3-mile radius. Sites like these are full of saw-cut floor joints, yard slabs and car park joints.

Sites like St Leonard's Hospital, 5.5 miles to the south-west of Foulford, carry ambulances, deliveries and visitors’ cars over their road and deck joints. Across sites such as Hightown Industrial Estate, 1.7 miles to the west of Foulford, floor and movement joints can be sealed in phases so units keep working. In a school such as Ringwood School Academy, movement joints in brick, block and hall floors tend to be forgotten until they leak.

Foulford is in Hampshire. Across the BH24 postcode area, the process is the same: send details, get a fixed quote, we seal, and the work is guaranteed. Our Hampshire coverage takes in 723 places, large and small. Our Southampton page has more on work in that area.

We cover the BH24 postcode districts. Close to Foulford, our area also takes in Forest Corner (1 mile north-west), Shobley (1 mile north), Hangersley (1 mile north-west), Hightown (1 mile south-west) and Poulner (1 mile west). Further afield, our area takes in Totton (11 miles north-east), Lymington (11 miles south-east), Romsey (15 miles north-east), Hythe (15 miles east), New Milton (7 miles south-east) and Barton on Sea (8 miles south-east).

Near you in Foulford

Nearby you will also find St Leonard's Hospital (5.5 miles south-west). The countryside around Foulford includes Blashford Lakes and Linbrook Lake.

Map of Foulford © OpenStreetMap contributors

Surface by surface

Internal floor movement joints

Warehouse and retail floors have saw-cut induced joints and construction joints. Trafficked floor joints often get a semi-rigid filler and a flexible sealant where the joint moves more.

Car park decks and ramps

Failed deck joints often show as leaks on the level below. We strip the old seal, prepare the edges and seal again flagging broken edges along the way.

Accreditations

Trusted. Accredited. Insured.