Kent · England

Commercial sealant contractors in CT6

Commercial sealant, construction mastic and joint sealing across CT6, from Herne Bay, Greenhill and Beltinge, with a fixed quote before we start.

Sealant contractors for CT6

Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.

Our commercial sealant contractors service in CT6

Commercial occupiers rarely want a floor out of action for sealant work. Tell us your site hours and access windows and we’ll plan around them; phased work can also be planned so areas stay in use. That applies whether the building is an office, a shop, a hotel, a college or a care home. Site teams most often ask us about leaks that seem to come through a sealant line and sanitary sealant that has gone black and patchy, across washrooms and tea points, floor and threshold joints and movement joints in walls and floors.

We schedule the visit to fit the site hours and access windows you give us. On the day, the work area is kept contained and tidy, and your contact hears from us before we move to the next area.

  1. We begin with whatever information you have, whether that’s photographs, a drawing or a list of locations, or we arrange a site visit.
  2. The failure is diagnosed and a fixed quote issued for the work agreed.
  3. Site hours, access windows and the order of areas are agreed before we start.
  4. The failed bead is removed and the joint faces cleaned until they’re sound and dry.
  5. Backing and primer go in where needed, then the chosen sealant is applied and tooled.
  6. Each area is inspected, signed off and backed by our 12-month guarantee.

How we quote

The specified product makes a difference, and so does the preparation, from cutting out to priming and backing rod. Access, phasing and site requirements come into it too.

What you get with us

  • 12 months’ guarantee on every job
  • Failed material removed, not covered up
  • Work to your specification and the manufacturer’s guidance
  • Fully insured, including public liability cover

Ask for a quote

Tell us about the building, the joints and when you need the work done, and we’ll put a fixed quote together. The easiest way is to speak to us on 01277 525 020 or email a schedule or drawings.

What’s near Herne Bay

We work on buildings around Curtis Wood, Herne Bay Junior School and Herne Bay High School and the streets around them. Other local landmarks include Queen's Head Public House (under half a mile north-west) and Christ Church (less than half a mile north-west). The closest station to Herne Bay is Herne Bay station, roughly 0.7 miles west of the centre. Nearby you will also find Tankerton Castle (4.3 miles west) and Whitstable and Tankerton Hospital (3.6 miles west). Not far away are West Blean and Thornden Woods.

Where commercial joints are in CT6

The commercial stock in CT6 mixes older town-centre buildings with newer offices and units, in places such as Herne Bay, Greenhill and Beltinge and beyond. Surfaces decide the sealant, from masonry to powder-coated frames and shop-fit panels.

The South East has large numbers of business parks and industrial estates, especially around the motorway corridors, and CT6 is part of the area we cover. Parts of CT6 lie on or near the coast, where wind-driven rain and, closer to the shore, salt air are harder on external joints. Product choice and joint preparation matter more there.

Herne Bay: If you have premises on more than one site, say at Eddington Business Park and St. Augustine's Business Park, one contractor and one quote can cover both. For a hotel such as The Pier Hotel (0.6 miles north-west of Herne Bay), the colour of a joint at the bar or the bath matters to the look of the room.

Aftercare for building managers

Every sealant joint needs some looking after, and how long they last depends on how they’re treated. Our advice:

  • Look at the sealant around anything that has been moved or replaced
  • Keep barriers up until the new sealant has cured
  • Put external and wet-area joints on a regular inspection round
  • Have extract fans checked so wet areas dry out

Let your cleaning contractor know what’s new. Scourers, blades and harsh products shorten a bead’s life; a mild cleaner is all most joints need.

Tenants and staff spot black or split sealant quickly, and it reflects on how the building is run. Replacing it on a planned cycle keeps complaints down.

Work for main contractors and building owners

If you look after buildings for someone else, you need clear quotes and clear reporting. We quote a fixed sum, confirm the scope and walk the finished work with you or your representative, plus a 12-month guarantee.

Building owners and managing agents use us on sealant work across single buildings or whole portfolios around CT6. Several sites can go on one quote, so there’s one set of paperwork to deal with.

Why act early?

It can be tempting to hold sealant work back until the next refurbishment. That’s reasonable for internal joints that are just tired-looking, but external and wet-area joints that already leak shouldn’t wait. We can seal the urgent joints now and leave the rest for the programme.

Comparing quotes

  • Will failed sealant be removed rather than covered?
  • Is depth set with backing rod, or bond-breaker tape in shallow joints?
  • Whether primer will be used where the manufacturer specifies it
  • What site paperwork they can supply

What sealant work can’t fix

Before quoting, we check that sealant is the right answer. It isn’t the answer for:

  • Structural cracks or movement the joints weren’t designed for
  • Misted, cracked or failed glazing units (a glazier’s job)
  • A dripping trap, valve or pipe behind a fitting

Why it fails

Plenty of failed joints were never sealed with the right product. Painters’ acrylic in a moving joint, vinegar-smelling silicone on metal or natural stone, or a high-modulus product where a low-modulus one was needed all let go sooner than they should. BS 6213 gives guidance on choosing construction sealants, and many specifications refer to it.

Any of the following is a good reason to get the joints checked over:

  • Layers of sealant, all of them failing
  • Leaks that seem to come through a sealant line
  • Movement joints packed with grit and debris
  • Frame sealant that has cracked, shrunk or pulled away

Your questions answered

What site paperwork can you provide?

We confirm documents at quote stage: most clients ask for RAMS, our insurance certificate and CSCS details. Every applicator holds a CSCS card.

How long does a job like this take?

We plan the time on site around your programme and access. We’ll give you an estimate of time on site when we quote.

Are you CHAS accredited and on Constructionline?

Yes. CHAS accredited, Constructionline member, and our applicators hold CSCS cards.

Is it fine to apply new sealant on top of old?

No, never. Sealing over old material is one of the classic causes of early joint failure, so everything comes out first.

Do you cover CT6?

Yes. CT6 falls within our area, and the simplest way to start is to ring 01277 525 020 or send details through our quote form.

What do you need from us to quote?

Send what you have, even a few photographs and rough lengths. Questions or a site visit follow where needed, then a fixed quote.

Can areas stay open during the work?

Phased work can be planned so areas stay in use. Tell us your site hours and access windows and we will plan around them.

Accreditations

Trusted. Accredited. Insured.