The Mastic Doctor team standing beside their branded vans outside an office building
Na h-Eileanan Siar · Scotland

Expansion and movement joint sealing in Rubha Ban, Na h-Eileanan Siar

Expansion and movement joint sealing in walls, decks and floors in Rubha Ban. CHAS accredited, Constructionline member, with a 12-month guarantee on workmanship.

  • Rain penetration at brick or block movement joints
  • Hardened, cracked sealant on exposed facades
  • Expansion joints filled with dirt and stones
1
Send details
Send the specification, photos or a marked-up plan.
2
Get a quote
One fixed quote covering the agreed scope.
3
We seal
The right sealant, to the right depth, neatly finished.
4
Guaranteed
Backed by a 12-month workmanship guarantee.
London, the South East & Scotland
Constructionline member
£5m PL insurance

Expansion joint sealing in Rubha Ban

Photos, a specification or a quick description of the joints is enough to start a fixed quote.

Expansion joint sealing in Rubha Ban

Few joints take as much punishment as those in a car park. Tyres load the edges, and de-icing salts and water work into any gap. A sealant suited to traffic and the expected movement goes in, phasing bays so the car park can stay in use. We work on brickwork movement joints, podiums and floor movement joints and cladding panel joints, and the failures we’re asked to look at most are expansion joints split through the centre of the bead and water dripping through deck or ramp joints. Whoever orders the work in Rubha Ban, the brief is usually the same: a fixed quote, no surprises on site and a 12-month guarantee behind the result.

Travel to smaller places like Rubha Ban is planned so the work is done in one trip where possible. Photos, approximate widths and what uses the floor help us bring the right materials.

A 12-month guarantee applies to all our work in Na h-Eileanan Siar. If an installation problem shows up, call the office on 01277 525 020 or email a schedule or drawings and we will arrange a return visit.

Mastic Doctor team members lined up next to their branded vans outside an office building
Place
Rubha Ban (HS8)
Region
Na h-Eileanan Siar
Cover
12 months on our workmanship
Price
Quoted before any work starts
Phone
01277 525 020
Page updated
3 November 2026

What the job involves on each surface

Brickwork and blockwork joints

A brick movement joint full of old mortar or debris can’t close. We clear the joint fully before sealing.

Joints between different materials

Junctions between brick and render, or concrete and cladding, move independently. We choose a sealant that grips both faces, with primer where specified.

From enquiry to sign-off

Inspect, seal, sign off: every visit follows that pattern. We inspect the joints and confirm what’s in scope, then the work is carried out to the specified product and detail, and we finish with a walk round so the work can be signed off. Jobs near Rubha Ban are often grouped with others in the same area, to make the most of each trip. Tell us how flexible your dates are.

  1. We look at the joints, their width and how they’ve failed.
  2. A fixed quote follows, naming the sealant and its movement class.
  3. Old sealant and filler are cut out and the joint faces cleaned back to sound material.
  4. Closed-cell backing rod is set to depth, or bond-breaker tape in shallow joints.
  5. Where the maker calls for primer, it’s applied first, then the bead goes in and is tooled to a concave finish.
  6. Each joint is inspected and handed over with our 12-month guarantee.

Preparing the site

  • Agree which areas must stay open
  • Clear stock, furniture or equipment away from the joints
  • Confirm the product named in the specification

Get a fixed quote

Photos, drawings or a schedule of the joints and a fixed quote comes back to you. Where a site visit makes more sense, we will arrange one.

Get a price

Advice

What we can’t put right

A proper diagnosis includes knowing what sealant can’t do. We will tell you if the real problem is one of these:

  • A joint that has to be widened or re-detailed before it can work
  • Broken or spalled joint edges, which need repairing before any sealant goes in
  • Failed waterproofing membranes on podiums, roofs or decks (a waterproofing specialist’s job)

Not sure which it is? You can call 01277 525 020 or email us and we will tell you honestly before you book.

What we seal

  • Precast concrete panel joints
  • Cladding panel joints
  • Blockwork control joints
  • Brickwork movement joints
  • Car park decks and ramps
  • Podiums and floor movement joints

Expansion joint sealing around Rubha Ban: points for this area

Rubha Ban lies within about 2 miles of the sea. Coastal yards and decks give their joints salt and wet weather to deal with, not just wheels, and edges left open tend to break up faster. Work on Rubha Ban has to fit the ferry timetable and the forecast. Approximate joint lengths and widths let us bring enough material first time.

For floors and slabs around Rubha Ban, the product is chosen for the traffic and the movement at each joint.

Rubha Ban is in Na h-Eileanan Siar. Rubha Ban sits inside our coverage and the rest of Na h-Eileanan Siar, and jobs here get the same fixed quote and 12-month guarantee as anywhere else. Rubha Ban is one of 87 places we cover in Na h-Eileanan Siar for movement joints.

Work on movement joints is covered throughout HS8, whatever the building. Just outside Rubha Ban, we also work in Lochboisdale (5 miles north), Loch Baghasdail (5 miles north), Eòlaigearraidh (6 miles south-west), Dalabrog (6 miles north) and Cuidhir (9 miles south-west). For island and remote sites, travel and materials need planning ahead, so the full address helps from the start.

Near you in Rubha Ban

Other landmarks nearby include Calvay Castle (4.4 miles north). Not far away are Beinn Sciathan.

Map of Rubha Ban © OpenStreetMap contributors

Owners, agents and contractors

Whether you’re a managing agent, a property factor or an owner’s representative: send the details, accept a fixed quote, and we carry out and guarantee the work. We can agree access arrangements and keyholder contacts beforehand.

For main contractors, we work as the sealant subcontractor, on new build and refurbishment alike. Programme, specification and site rules come first.

Common questions from Rubha Ban clients

Does the sea air around Rubha Ban change the choice of sealant?

It can. Driven rain and salt are tougher on outside sealant than sheltered inland conditions. We check the specified product suits the exposure and pay close attention to preparation.

Can you take on a job in Rubha Ban, on the island?

Yes, Rubha Ban is within the area we cover. We work across every Scottish council area. Island work is planned around ferry crossings and the weather, so photographs and a full list before we travel are essential.

Can you handle several sites?

Yes. We take on portfolio and planned maintenance work, with each site phased to suit its occupants.

Can weather delay the job?

For external joints, yes. Sealant needs a dry joint and a temperature within the product’s range, so frost, rain or cold mornings can delay outside work. Inside work is seldom held up.

Can you seal joints in cold or wet weather?

Weather matters for any external joint because a damp or frozen joint won’t take a proper bond. Indoor joints can usually carry on regardless.

What hours do you work?

Give us your site hours and any access windows in your enquiry, and we’ll plan around them. Our office runs Monday to Friday, 8am until 5pm.

Can you work on car park ramps and decks?

Yes. Tell us how the car park is used and which areas must stay open.

What we are called out for in Rubha Ban

Weathering wears down sealant on exposed elevations and decks. UV hardens the surface, and the sealant loses its ability to stretch and opens at the next temperature swing.

What tends to prompt an enquiry:

  • Weathered movement joint sealant that no longer flexes
  • Car park joints leaking onto vehicles below
  • Rain penetration at brick or block movement joints
  • Movement joints with split or torn sealant

A joint near Rubha Ban that has lost its sealant lets in water and grit, and the edges suffer next; we’ll tell you if the edges need repairing first.

What your quote should include

  • Can the work be phased to keep areas open?
  • Their public liability cover
  • How the joint faces will be prepared and primed
  • Will failed sealant be removed rather than covered?

Questions to ask before you appoint anyone

Maintenance after handover

Your facilities or cleaning team can help the joints last. Share these points with them:

  • Inspect exposed joints once the cold weather has passed
  • Clear dirt from joint lines during routine cleaning
  • Keep traffic off new joints until the cure time is up
  • Brief car park operatives to protect joint lines during winter clearance

Floor joints on main traffic routes need watching more closely than the rest. Keep racking feet and heavy point loads off joint lines and flag chipped arrises before they spread.

Floor joints with failed fillers break up quickly under wheels. Damaged edges make the floor rough and wear wheels faster, and the damage spreads along the joint. Sealing early protects the edges.

Accreditations

Trusted. Accredited. Insured.