The Mastic Doctor team standing beside their branded vans outside an office building
Edinburgh · Scotland

Construction and new-build mastic in Ratho Station, Edinburgh

Mastic packages for new-build and refurbishment projects across Ratho Station, by CSCS-carded applicators. CHAS accredited and fully insured.

  • Sealant knocked or painted over by other trades
  • Inconsistent sealant finishes from plot to plot
  • Failed sealant in an existing building being refurbished
1
Send details
Photos, drawings or a schedule, or we visit.
2
Get a quote
A fixed quote for the work, with the scope in writing.
3
We seal
The right sealant, to the right depth, neatly finished.
4
Guaranteed
12-month guarantee on our workmanship.
Covering the South East & Scotland
CHAS accredited
Fully insured: £5m PL

Construction mastic for Ratho Station sites

Send drawings, photos or a joint schedule, or tell us about the site, and we’ll come back with a fixed quote.

Construction mastic for commercial buildings in Ratho Station

Refurbishment work needs a slightly different approach from new build. Old beads come out completely, as fresh silicone can’t grip old and the asbestos survey is checked first on older stock. New and existing joints then get the same preparation. The enquiries we see most involve missed perimeter joints on a new elevation and cracks opening in caulked internal joints, across sanitary and kitchen joints, window and door perimeters and brick and block movement joints. Whether you call it commercial sealant work, mastic application or joint sealing, the work in Ratho Station is the same: failed joints cut out, faces prepared and the right sealant laid to the right depth.

External sealing around Ratho Station depends on dry faces and the right temperature. We build some give into the plan and agree it with the site manager.

We stand by our work: 12 months, guaranteed. It covers how we prepared and applied the sealant.

Place
Ratho Station (EH28)
Wider area
Edinburgh
Cover
12 months on every job
Quote
A fixed quote before we start
Phone
01277 525 020
Page updated
3 November 2026
Mastic Doctor team members lined up next to their branded vans outside an office building

Sites and facades in and around Ratho Station

Several hotels sit less than 2 miles from Ratho Station. Hotel schemes tend to have fixed reopening dates, so the mastic is programmed tightly with the other trades. Ratho Station is on Scotland’s drier eastern side. Winter mornings can still bring frost and condensation on steel and glass. We agree external dates with the site team and keep internal work ready.

University estates such as Heriot-Watt University (to the south-east of Ratho Station) tend to have a rolling programme of new buildings and refurbishments, each with window perimeters and facade joints to seal. Units on estates such as Lochend Industrial Estate (to the west of Ratho Station) tend to be reclad and refitted as tenants change, and each job leaves cladding and perimeter joints to seal.

Ratho Station is about 3 miles south of Queensferry, in Edinburgh. Across the EH28 postcode area, it works the same way: send details, get a fixed quote, we seal, and the work is guaranteed. Ratho Station is one of 174 places in Edinburgh on our list. Our Edinburgh page has more on work in that area, about 7 miles away.

If you need construction mastic in EH28, the process matches everywhere else we work: details, then a fixed price, then sealing and a 12-month guarantee. Among the streets we cover are Station Road, Lilybank Road and Hillwood Road. Sites close to Ratho Station are covered too, including Ingliston (1 mile east), Ratho (1 mile south), Gogar (2 miles east), Lennie (2 miles north-east) and Hermiston (3 miles east). Nearby towns on our patch include Edinburgh (7 miles east), Leith (9 miles east), Bonnington (8 miles east), Greenside (8 miles east), Broughton (8 miles east) and Bellevue (8 miles east).

Landmarks near Ratho Station

For rail, the closest station is Edinburgh Gateway station, about 2.6 miles east. A little further out are Illieston Castle (2.5 miles south-west) and Linburn Centre (2.6 miles south). Not far away are Corstorphine Hill and Dundas Loch.

Map of Ratho Station © OpenStreetMap contributors

FAQs: Ratho Station

Will you plan work around the academic year at somewhere like Heriot-Watt University?

Yes. Education sites usually want the work in vacations or in phases during term, and we plan to suit. We’re CHAS accredited and a Constructionline member, and paperwork such as RAMS is confirmed with the quote.

Can you take on a job at a hospital such as Linburn Centre?

Yes. Healthcare sites are among the places we work. We follow the site’s permits, sign-in and infection-control procedures in every area.

What happens if old sealant might contain asbestos?

The duty to manage asbestos sits with the building’s dutyholder, so we will ask for the register before work on an older building. Work pauses if suspect material is found, until it has been tested.

Do you take on multi-site work?

Yes. Several buildings can share a single quote, and you deal with one contact throughout.

Can you fit around our programme?

Our work is sequenced around the programme. Each plot, floor or elevation is sealed when it’s ready.

Can you quote from photos?

Many jobs can be quoted from photographs, drawings or a joint schedule. Where they aren’t, we arrange a site visit before quoting.

Do you have public liability insurance?

Yes. Mastic Doctor is fully insured, public liability included.

Common problems we fix in Ratho Station

Shrinkage and settlement in the first months put new joints under strain. Materials lose construction moisture and shrink and internal caulk in a moving joint is usually the first to crack. Picking a flexible sealant where there’s movement keeps snags down.

Look out for the following:

  • A mastic package split between trades with no clear owner
  • Frame perimeters left unsealed or poorly sealed
  • Perimeter gaps outside the sealant’s range
  • Snag items on joints that need redoing before handover

Hotel extensions and refits, at places such as Norton House Hotel, under half a mile to the south-east of Ratho Station, normally run between busy periods, so the sealing is squeezed into short windows.

Before you book anyone

  • Their public liability cover
  • Who will actually carry out the work
  • Is the sealant right for the movement and the substrate?
  • How the joint faces will be prepared and primed

How to choose a sealant contractor

Our process

On arrival, we sign in, go through any site induction and check how permits are handled. Floors, finishes and fittings next to the joints are covered before anything is cut or cleaned, with the work itself typically taking a day or two on a small fit-out and several weeks on a large multi-storey package. For work around Ratho Station, we aim for one trip, which is why we ask for photographs and a full list first. Outside work also needs a suitable weather window.

  1. First we look at the scope on site or from drawings.
  2. You receive a fixed quote covering scope, products and sequence.
  3. Site paperwork is confirmed and our CSCS-carded applicators are inducted.
  4. We seal plot by plot or floor by floor in line with the programme.
  5. Any frame gaps or issues outside our scope are flagged to the site team.
  6. The package is closed out, snags cleared and backed by our 12-month guarantee.

Before we start on site

  • Make sure the joints can be reached
  • Have the specification and drawings to hand
  • Share your working hours and any access restrictions

Quotes

Photos, drawings or a schedule of the joints and a fixed quote comes back to you. If the job needs a look first, we’ll arrange a site visit.

Ask for a quote

Related advice

Work for main contractors and building owners

Agents, factors and owners’ representatives all follow the same route: send the details, accept a fixed quote, and we carry out and guarantee the work. We can agree access arrangements and keyholder contacts beforehand.

Housing associations and managing agents often need work done across blocks and communal areas. Work can be phased so residents and staff keep access throughout, and each stage is agreed with your contact.

Should maintenance staff do it?

Putting right a botched joint often costs more than sealing it well at the start, because the whole bead must be removed and the faces cleaned back again. For that reason, many FMs and contractors use a sealant specialist from the outset.

What you see is the finished bead, but most of the work is hidden. Backing rod, primer where specified and a joint designed to move with the building are easy to get wrong without experience.

What happens if it’s left?

Patching snags as they appear can feel quicker than a proper close-out. But one planned snagging pass through each area usually clears more for less disruption, and avoids repeated visits. Snagging can be priced as a separate stage. Exposed buildings in Scotland take a lot of weather, so it’s worth renewing joints around Ratho Station before they leak.

The specified product makes a difference, and so does the preparation, such as cutting out, priming or new backing rod. Access, phasing and site requirements come into it too.

Why us?

  • Over 20 years of commercial sealing
  • Health and safety: CHAS accredited
  • RAL and finish matching where the product range allows
  • Colour agreed before work starts

Take a look at what affects the cost and our accreditations.

Aftercare for building managers

Once the work is signed off, a little attention goes a long way:

  • Stick to the specified sealant rather than a generic substitute
  • Brief the final clean team to avoid blades near sealant
  • Plan external elevations with the weather in mind
  • Ask for joint and product checks before the package is urgent

A new structure shifts as it loses construction moisture. The right product in each joint copes with that, but caulk in a joint that moves more than expected may crack. If that happens, let us know.

Snag items left to the last week put handover at risk. A planned close-out through each area as it completes keeps the list short and keeps handover on track.

Accreditations

Trusted. Accredited. Insured.